Hager Contain/FP-CS 880909COPPELL PUBLIC WORKS
September 9, 1988
TO:
Taryon Bowman, Planning & Zoning Coordinator
FROM:
Howard Pafford, Water Foreman
Per Birdsall, Street Foreman
Richard Diano, Park Foreman
Steve Morton, Public Works Inspector
Dana Kamp, Sign/Signalization Technician
RE:
Hager Containers
We have reviewed the above referenced development plans along with
the Director of Public Works and have determined that Staff has no
objection to this development, including those variances requested.
Below are comments and 2 fee calculations; one based on 98,000 square
feet, the other 8,000 square feet. The 8,000 square feet only
represents the office area.
Water Availability Fee on 98,000 sq.ft.
50% due at Final Plat $1470.00
50% due at Building Permit $1470.00
Sewer Availability Fee on 98,000 sq.ft.
50% due at Final Plat
50% due at Building Permit
$1470.00
$1470.00
Water Tap Fees on 4 meters
100% due at Final Plat
$400.00
Water Availability Fee on 8,000 sq.ft.
50% due at Final Plat
50% due at Building Permit
$240.00
$240.00
Sewer Availability Fee on 8,000 sq.ft.
50% due at Final Plat
50% due at Building Permit
$240.00
$240.00
Water Tap Fees on 3 meters
100% due at Final Plat
$300.00
Staff met with Bill Anderson, Engineer for Hager Containers, to discuss
the City's requirement for full flow meters on private fire lines.
After reviewing Mr. Anderson's proposal for 1 - 10" line for service
of closed and open fire protection at this site, staff was in agreement
with the proposed meter setting (DDC II).
The sprinkler system inside the building will be a closed system.
In the event water is used from the sprinkler system, an alarm will
sound at the Fire Station. All fire hydrants on site will be equipped
with Hydra-Storz connections at the expense of the developer. This
type of connection greatly restricts unauthorized use of fire hydrants.
HLP/PHB/RED/SMM/DFK/sm
cc: Steve Goram, Director of Public Works