Loading...
Highland Oaks/FP-CS 860106GINN, INC. January 6, 1986 C{}NSI'I.,TING ENGINEERS Mr. David Pickett Pickett Investments 1919 South Shiloh Road, Garland, Texas 75042 Suite 320 Re: Highland Oaks Final Acceptance Dear Mr. Pickett: A final inspection was conducted on December 23, 1985 for the above referenced project by representatives of Ginn, Inc. and the City of Coppell. Ail items to the project are in compliance with the standards set forth by the City of Coppell subdivision requirements and are found to be acceptable to both parties. As- built drawings and one-year maintenance bonds have been received from both parties with a maturity date of January 1, 1987. Sincerely, Randy Fleming cc~P.E., City of S~ - Per Birdsall Jim Pitts Treece & Company GINN, INC. CONSULTING ENGINEERS Utilities Pavin~ Weaver Construction Co. P. O. Box 29309 .Dallas, TX 75229 214/ 247-9611 Metro: 263-2360 J. C. Boney Construction Co. P. O. Box 59485 Dallas, TX 75229 243-2348 or 620-0922 11350 Luna Rd. 2700 Arbuckle