Loading...
Lakes of C/PP-CS 840919 (2)TRI LP. ND , September 19, 1984 Mr. Wayne Ginn, P.E. Ginn, Inc. Consulting Engineers 16135 Preston Road, Suite 106 Dallas, Texas 75248 Re: Final Plats Lakes of Coppell Addition Dear Mr. Ginn: I am in receipt of your letter dated September 17 and have the following comments. 1) MacArthur Boulevard - the right-of-way approved for this street by City Council on July 10th on our' preliminary plat was 100 feet. If a variance is required to keep the right-of-way 100 feet, it is so requested. The request for an additional 10 feet of right-of-way within 300 feet of Sandy Lake Road is excessive. Our traffic consultant, DeShazo, Starek & Tang indicate in their study which you have reviewed, a free right turn for MacArthur Blvd south to Sandy Lake Road west is not needed and we request a variance deleting this requirement. However, if the City feels this is required, we request the additional right-of-way needed be consistent with the curves and storage of the right turn lane (i.e., the same width parkway be maintained through the curves for the transition) and then the storage not exceed 80 feet. 2) 3) Parkway Boulevard - the right-of-way will be changed to 65 feet. This street is not to be constructed as a four lane divided boulevard, except at its intersection with MacArthur Boulevard per your request. The right-of-way at this location will be widened accordingly. The right-of-way of Village Parkway is 60 feet and has been corrected to be consistent on the plat and construction plans. Triland Development, Inc. · One Lincoln Centre, Suite 1000 · 5400 LBJ Freeway · Dallas, Texas 75240 · (214) 934-1234 · Telex 794183 Nr. Wayne Ginn September 19, 1984 Page 2 In regard to plat for Sandy Lake Road widening, I request that the plat not be submitted at this time. Since we are only filing street dedication plats, and there are no construction plans for Sandy Lake Road, I request this widening occur when the properties abutting the roadway are platted for development. The escrow deposit for future improvements can be made at that time. As for the Allen Road abandonment plat, we could submit this but until something is constructed to provide access in lieu of Allen Road, it is my understanding the abandonment could not occur. The abandonment plat for Kimbell Court is almost prepared and can be submitted shortly. Please outline the procedure for plat and street abandonment so we can take the appropriate steps. I appreciate your written comments and if you have any questions, please contact me. Sincerely, TRILAND DEVELOPMENT, INC. Lyn~ Kadleck, P.E. Senior Vice President Engineering and Construction LK/db cc: Ron Ragland, City Manager Mark Sweeney Nathan Maier