MacPlaza1Upper/FP-DR 971031~ELECTRIC
Comments for the City of Coppell
Development Review Committee
~-im~a~/Final Plat for
Date t 0 ~ 5/'--~ ?
Preliminary/Final Plat is not acceptable.
Easements will be required for proposed electric facilities. A plat with easement
requirements will be provided to the developer.
V//Other comments
Load information (size of structure, AC/Heat Load) will be required from the
developer before easements can be determined.
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234