Loading...
MacPlaza1Upper/FP-DR 971031~ELECTRIC Comments for the City of Coppell Development Review Committee ~-im~a~/Final Plat for Date t 0 ~ 5/'--~ ? Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. V//Other comments Load information (size of structure, AC/Heat Load) will be required from the developer before easements can be determined. Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234