Loading...
MacPlaza1Sonic/FP-DR 960529'tUELECTRIC _ : '. 'i z ' t,,IA¥ 3 01996 Comments for the City of Coppell Development Review Committee P~e~~r_~/Final Plat for Date ~-~_ ~..c~__~/ ~ ~//~Final Plat is not acceptable. ~/Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234