MacPlaza1Sonic/FP-DR 960529'tUELECTRIC
_ : '. 'i z '
t,,IA¥ 3 01996
Comments for the City of Coppell
Development Review Committee
P~e~~r_~/Final Plat for
Date ~-~_ ~..c~__~/ ~
~//~Final Plat is not acceptable.
~/Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234