MacPlaza1Sonic/FP-DR 960606 City of Coppell
Development Review Committee Comments
Planning Department
MacArthur Plaza Addition, Lot 5, Block 1, Final Plat
(Sonic Drive-Through Restaurant)
DRC Date: June 6, 1996
Planning & Zoning Commission Meeting:
City Council Meeting: July 9, 1996
June 20, 1996
1)
2)
3)
4)
Correct signature blocks (see attachment).
Provide plant material and quantity summary table on landscape plan. Note on face of
the landscape plan referencing preliminary plat plant material and quantity listing is not
sufficient.
Be consistent in showing shape and location of monument sign on both the landscape plan
and site plan.
Indicate Lot and Block number in title block of final plat.
Note:
A.
B.
C
Staff written comments will be faxed to each applicant.
Please revise plats, landscape plans, and utility plans based on staff recommendations.
Should applicant disagree with staff comments please provide reasons why staff
recommendations should not be followed when you attend the June 6, 1996
Development Review Committee (DRC) meeting.
Each applicant will bring one new set of revised plats and plans to the June 6th
meeting. Applicants will be asked to show, explain and defend any revision. An
Engineer for the project or other representative is urged to attend the meeting.
DRC
Applicant will have till noon Tuesday, June llth to resubmit seventeen (17) folded
copies of revised plans, three (3) reduced paper copies (8 1/2 X 11) and one (1)
transparency (8 1/2 x 11) of each exhibit to the Planning Department.
e
sections of this Article 5.
Base flood (including design base flood) elevation data shall be generated for
subdivision proposals and other proposed development including
manufactured home parks and subdivisions if not otherwise provided.
All subdivision proposals including manufactured home parks and subdivisions
shall have adequate drainage provided to reduce exposure to flood hazards.
All subdivision proposals must have the following note placed on the
preliminary and final plat:
"Floodplain Development Permit Application No. has been
filed with the City of Coppell Floodplain Administrator on
, 19 .
· Date·
, Floodplain Adminis~a. tor,
All subdivision proposals shall have the boundaries of the 100-year floodplain
and floodway clearly shown on the preliminary and finn] plat.
AU lots with~ or adjacent to the lO0-year floodplain shall have the lowest
floor elevation for each building site shown on the final plat.
When any part of a subdivision Hes within or adjacent to the lO0-year
floodplain, a permanent bench m_n_rk tied to a designated National Geodetic
Vertical Datum marker shall be established within the subdivision at an
accessible location. The bench mnrk and tie shall be located and referenced
with all pertinent informn_tion on the final plat along with a registered public
surveyor's seal
When any part of a completed subdivision is within or adjacent to the 100-
year floodplain, the following note must be placed on the final plat:
'The developer, builder, seller, or agent shall inform in
writin& each prospective buyer of subdivision lots or
property located within special flood hazard areas of this
site that such property is in an identified flood hazard
area and that all development must conform to the
provisions of the City of Coppell Floodplain
Management Ordinance."
The written notice shall be filed for record in the county Deed of Records
28 AGC~228
The undersigned, the City Secretary of the City of Coppell, Texas, hereby certifies that the
preliminary plat of the Subdivision or Addition to the
City of Coppell was submitted to the City Council on the day of ,
19 , and that the Council, by formal action, then and there approved the preliminary plat
and by separate motion designated the Planning and Zoning Commission to be the Municipal
Authority responsible for the approval of the Final Subdivision Plat of such land and the Final
Subdivision Plat of such land need not be brought back for final approval of the City Council
unless, through inaction on the part of the Planning and Zoning Commission, such Final
Subdivision Plat is deemed approved by the Planning and Zoning Commission for failure to act
within the 30-day period required by law.
Witness my hand this
day of , A.D., 19 ,
City Secretary
Final Subdivision Plat approved by formal action of the Planning and Zoning Commission on
the day of , 19 , thereby accepting the dedication of
streets, alleys, parks, easements, public places, and water and sewer lines, as shown and set
forth in and upon said plat and authorizing its Chairman to note the acceptance thereof by
signing his name as hereinbelow subscribed.
Chairman, Planning and Zoning Commission
City of Coppell, Texas
Date
ATTEST:
Secretary, Planning and Zoning Commission
City of Coppell, Texas
Date