Loading...
Minyard/PP-DR 960829'tUELECTRIC Date Comments for the city of Coppell Development Review Committee Preliminary/Final Plat for ~/p~/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. ~ Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234