Loading...
Minyard/PP-DR 960829 (2)DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: ~mvard Addition Lots 1 & 2, Block 1, Minor Plat (submitted ~ Preliminary & Final Plat, to allow the development of an expansion of the warehouse, as well as to accommodate the existing Minyard facility, located at the southwest comer of Bethel Road and Freeport Pkwy., at the request of David Moak Surveyors, Inc. DRC DATE: August 29, 1996 and September 5, 1996 CONTACT: Mike Martin, E.I.T., Assistant City Engineer 004-3679) COMMENT STATUS: ,/PRELIMINARY ~ R~gtg~D A 45' right-of-way dedication from centerline of Bethel Road should be provided. Provide easement for all meters and vaults located outside of the 45' right-of-way dedication. Provide floodplain administrator signature block.