Minyard/PP-DR 960829 (2)DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: ~mvard Addition Lots 1 & 2, Block 1, Minor Plat (submitted ~
Preliminary & Final Plat, to allow the development of an expansion
of the warehouse, as well as to accommodate the existing Minyard
facility, located at the southwest comer of Bethel Road and Freeport
Pkwy., at the request of David Moak Surveyors, Inc.
DRC DATE: August 29, 1996 and September 5, 1996
CONTACT: Mike Martin, E.I.T., Assistant City Engineer 004-3679)
COMMENT STATUS: ,/PRELIMINARY ~ R~gtg~D
A 45' right-of-way dedication from centerline of Bethel Road should be provided.
Provide easement for all meters and vaults located outside of the 45' right-of-way
dedication.
Provide floodplain administrator signature block.