Loading...
Magnolia Park/PP-CS 95112516250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 November 2-5, 1995 DOWDEY, ANDERSON AND ASSOCIATES, INC. CIVIL ENGINEERS Ms. Isabelle Moro City of Coppell Planning Department 255 Parkway Boulevard Coppell, Texas 75019 Magnolia Park Preliminary Plat Coppell, Texas Dear Isabelle: In response to you October 26, 1995 Pre Development Review Comments we have modified the preliminary plat to comply with the Planning Staff Comments and Letter of Conditions from Gary Sieb dated August 10, 1994. As Follows: We have modified item 12-3,1 (A.) FRONT YARD - to provide for a 30' front yard for (zoning area B) which is comparable to "SF 12" District and to provide for a 25' front yard for (zoning area A) which is comparable to a "SF 9" District. Bill Anderson thought the 30' front yard setback discussion at City Council was for the larger lots. Lot 51 was eliminated from the preliminary plat and lot 47 widened by 15 feet. We thought the intent of the City of Coppell was to provide a wider lot adjacent to the common area no. 10. We would prefer to add the 15 feet to the lot verses separating the lot by an alley. 2. Added PD 131' PD-HC and FP. 3. We added the signature block to the Preliminary Plat. 4. We have extra street names submitted and will restudy the proposed street names. 5. We have labeled common areas at the entry. 6. Noted 7. We have reviewed corner lots and final adjustments will be made with the final plat. Ms. Isabelle Moro Page 2 November 1, 1995 We have modified the preliminary plat and water, sewer and storm plans as follows in response to Ken Griffin's engineering comments. Preliminary Plat Comments: 1. Added comer clips and visibility easements at all street intersections. 2. We will provide metes and bounds description of all common areas with the final plat. 3. We have shown visibility triangles at Denton Tap Road. 4. It is our desire to save as many trees as possible in the entry area. We are proposing a 35' Right-of-way and 25' of paving in this area. 5. Entrance roadway is in the floodplain. We would propose to raise the entry paving above the 100 year flood plain. An on ground topo will be shot in this area and analyzed versus the existing flood sections. Preliminary Water Sewer and Storm Drainage Plan Comments: The installation of the sewer system will be coordinated w/Centex. Water and sewer lines have been stubbed to the west property line. Concern regarding sanitary sewer radius. We will look at option to bring sanitary sewer and water to Denton Tap along North line of entry area if this is the area of concern. Ms. Isabelle Moro Page 3 November 1, 1995 General Comments: Concerns regarding ingress in egress. Discuss at DRC. Building Inspection Comments: Date: October 26, 1995 Greg Jones 1. Panhandle lots 18/A, 4/C and 7/C have been revised to show 22 feet of width. 2. We have called out common areas at entry. Lone Star Gas Co. - Kevin Page Discussed extending gas from Parkway Boulevard north along Denton Tap to the project. T.U. Electric - Tim Brandeau Will discuss easements for electric at DRC meeting. If you have any questions or additional clarification or discussion is needed please call. Sincerely, Lynn Meyer, AICP LM:jrb