Mansions/FP-DR 970925 (4)TUELECTRIC
SEP 2 IS 1997
Comments for the City of Coppell
Development Review Committee
~-e~naxT/Final Plat for ,~"~~/P,,O..~
9-25-97
.EzalJ.miz~'y/Final Plat is not acceptable.
t.,//'Easements will be required for proposed electric facilities. A plat with easement
requirements will be provided to the developer.
~Load information (size of structure, AC/Heat Load) will be required from the
developer before easements can be determined.
Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234