Loading...
Fire Stat 2/PP,SP-DR 960530 (3) II / l " ELECTRIC Y301996 ii ii Comments for the City of Coppell Development Review Committee Date Preliminary/Final Plat reliminary/~Plat is~acceptable. /~Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the c~veloper. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234