Mockingbird El/PP-CS 900227DRC DATE:
REVIEW OF:
BY:
Shore Daneshman~d, Phone bi' 462-8495
FINAL PLAT AND PLANS:
i)
2)
Please make the following additions and/or corrections on
final plat as marked:
Name of the proposed subdivision must be consistent on
the plat and all pages of the construction plans, etc.
Location . . . width . . and the name of all existing
or recorded streets intersecting the boundary of the
tract.
4)
5)
6)
7)
Delineate the existing and proposed zoning of the site
and the surrounding properties.
The accurate outline of all property which is offered for
dedication for public use with the purpose indicated
there on. Fire lanes must be shown on final plats.
Certification by a registered Public Surveyor to 'the
effect that the plat represents a survey made by him.
Delineate utility signature block on the final plat.
Per Floodplain Management Ordinance 4~87390 (Art. 5, Sec.
C, Item 4, Page 34), all subdivision proposals must )lave
the following note placed on the preliminary and final
plats:
."Floodplain Development Permit Application No.
has been filed with the City of Coppell D'loodplain
Administrator,. on , 19 .... "
(Floodplain Administrator)
No Comment.
Page 1/3
(Date)
1)
2)
4)
5)
6)
7)
The following
contained in
pro J ect:
information, as marked, is required to be
the final construction plans of 'the above
Provide final construction plans, simultaneously 'with
final plat submittal. Final plans must have a cover
sheet, detailed design plans, and standard detail sheets.
A cover sheet, for final construction plans shall include
the following:
Name of the project
Owner's name and address
Engineer's name and address
Architect's name and address
Vicinity map
Index list, covering all pages included in the set
"Plan Approval Paragraph", see attached
Detailed final construction plans shall contain the
following:
* Ail required street paving plans and profile sheets.
* .All required storm drainage plans and profile sheets.
* All required alley paving plans and profile sheets.
* A complete and accurate drainage area map and
detail grading plan.
* All required letters of permision from adjacent
property owners.
* Ail required water and sewer engineering plans.
Provide barricading plans...
Provide trench.safety, sealed by a registered engineer
in the State of Texas.
Delineate proposed and existing water distribution system
and pipe sizes.
Delineate proposed and existing sewage collection system
and pipe sizes
Provide a Drainage Area Map covering two parts:
a) show On-site Drainage Map, on a scale of 1" = 20',
40'. 50' etc. . ' with all details as required in
the Subdivision Ordinance;
b) show the Off-site Drainage Map, on a scale 1" = 100',
200', etc . . Delineate the project's boundary on
it, plus the less detailed drainage system, to clearly
demonstrate the affect of such activities, drainage
outfalls, on the adjacent properties and the Drainage
Master Plan.
9)
lO)
~2)
1.3 )
~4)
~6)
~7)
all storm sewer systems must be designed for 100-year
design frequency. Technical Paper 40 should be used to
compute rainfall intensities, as per the Subdivision
Ordinance, (Appendix "A", Page 30).
Show the hydraulic calculations for each portion of the
storm system on the profile, such as pipe size, Q100
(cfs), Qc (cfs), S, v (FPS) etc. . .
Ail lots within or adjacent to the 100-year Floodplain
shall have the lowest floor elevation for each building
site shown on the site grading plans.
A'permanent bench mark must be established with in a
subdivision development, see attached Floodplain
Development checklist.
Each sheet of the plans shall contain a title block and
consistent page numbers.
Ail appropriate fees as per subdivision ordinance must
be paid.~
Delineate a Revision block on each sheet. Revision
dates must be shown on each sheet with Engineer's
initials next to them.
kll above comments must be addressed, prior to Staff's
recommendation for approval of the final plat and plans.
Provide a written response on all comments with
explanations provided on items not addressed as
requested above.
. · /
.,
DRC/COM/~ENTS/ENG/FINAL
SO/bb
Page 3/3
PLAN APPROVAL PARAGRAPI[
RE: Pla~s Prep~ced by
RE:
RE:
1.~:~4 Rcv,b~iort dccCc
She~ o6 Lc~,t Rcv,~iort (.k~Cc
Con~.,~clz~on P£an4 and Spe~L~i~'~o~ E~e~'&Lvc cLcu'~e
Tire above idem~L~ied pla~cs and spee, L~ica,'&ion~ have been ~cevi~uec/. and 6ound
~o bc in comp~ancc w~¢h 4kc app.~cblc Engincu~ng prou,~io~ of ~h.c MumL~pc~
Code o6 thc C~¢y 06 Copp~L&, Tczc~.s, Issuance 06 t~ ctpprov~ sh~L~ no~ bc
D~,Lg~ E~.~inc~ 6~om ~ccb,CLb'dy 60~ ;eke ccd~qucc~y o6 ~[t~ d~,Lg~ ~.o~c 6~com .~ab,CLLey
o,a~cd by o~. ~~ng 6rom ;CI'~ co~,'Ocuo~o~ o6 improv~m~m~ ~ p~covided 6o;c
i~ th.c above spc~ficct doc~cm~.
Shc~.~ no~ procc~ccl, umbel ;Cbc ow~.~uc hc~ c66e~cd ~omlo~ccr~c~ w~:k c~LL o.tk~Jc ctpp.~cccb.(~.~
prov,~io~ o~ tke Mu~Le~p~L Code of ,tko C,b'ty o~ eopp&LL'., Te.~ crud comp. LLancc
an.y ethel ~L ~tcq~tcmc~'~ o6 4kc C.OCy of Copp~LL, 'Fc.~c~, rcq~ng any approvc~
of 4:Itc Plan,~.ng and. ZomLng Comm.~sios¢ and
pos:t36rl, g o6 c~L bo~cls and d:hen scc~1.f.n.g an "App~e. ovc~f. ;t:o P2~.oceecl." 6~Lom .tltc~ C.~;ey
Any ch. ange. s mu4~ be app/~.oued by :die approp/bLcv~e /~.e.~c~ory ageneic,~ c~ coed;8
c~ the C.Lty I:-r~!linC~. A~teJ~..the Oev¢;~opeJc's De~.Lg~ Engirm~. app~.ove4 .the.
change, ;Cbc ¢~'Cy's assigrmd En~ine~ir, g '~m~pec;Cor sh~L8 be co,stub'Ced who
wi~ ~tlz~ approve and/or secc~e approuc~ f~com tkc C~ty Engine~, m'~ wl~ch
.Lime a su)op.~eme~t~ plan approved, w.L~ be a~fixed .~o th.c a. pp~coved plan.~, and
~.efe2~.e~.ced in a supp.~ememtm~, app~covr~L le;~:eJc by ;Cl~.e Cx';~y Engin¢.c,J~. A£.~ ~.evisioms
w.bL~ be in~P. ucLed in ~he "As-Bm6~" plarb6 lo be su.bmx~b'Ced. 30 clays a~t~c Su. bstarbf~a~
compl~ion o(~ a~ pub.Lac improueme~¢'~.
July 27, 1989
MEMORANDUM
TO:
FROM:
RE:
Russell R. Doyle, P.E., City Engineer
Larry Davis, Construction Inspector
PERMITTING PROCESS CITY OF COPPELL~- ENGINEERING DEPARTMENT
1) Approved
Engineer
2) Approved Site Plan for Excavation
3) Pre-Construction Conference With The En§ineering
Inspector Required Prior to Start of Construction
4) Excavation Permit Required
5) Utility Construction Permit Required
6) Paving Construction Permit Required
Engineering Plans Required - Stamped & Signed by the City
7) Additional Permitting May Be Required - Other
State, County and Federal
8) Early Rough Grading Must Be Approved Separately
LD/lsg
Construction
City Departments,
PERMTNG