Loading...
Mockingbird El/PP-CS 900227DRC DATE: REVIEW OF: BY: Shore Daneshman~d, Phone bi' 462-8495 FINAL PLAT AND PLANS: i) 2) Please make the following additions and/or corrections on final plat as marked: Name of the proposed subdivision must be consistent on the plat and all pages of the construction plans, etc. Location . . . width . . and the name of all existing or recorded streets intersecting the boundary of the tract. 4) 5) 6) 7) Delineate the existing and proposed zoning of the site and the surrounding properties. The accurate outline of all property which is offered for dedication for public use with the purpose indicated there on. Fire lanes must be shown on final plats. Certification by a registered Public Surveyor to 'the effect that the plat represents a survey made by him. Delineate utility signature block on the final plat. Per Floodplain Management Ordinance 4~87390 (Art. 5, Sec. C, Item 4, Page 34), all subdivision proposals must )lave the following note placed on the preliminary and final plats: ."Floodplain Development Permit Application No. has been filed with the City of Coppell D'loodplain Administrator,. on , 19 .... " (Floodplain Administrator) No Comment. Page 1/3 (Date) 1) 2) 4) 5) 6) 7) The following contained in pro J ect: information, as marked, is required to be the final construction plans of 'the above Provide final construction plans, simultaneously 'with final plat submittal. Final plans must have a cover sheet, detailed design plans, and standard detail sheets. A cover sheet, for final construction plans shall include the following: Name of the project Owner's name and address Engineer's name and address Architect's name and address Vicinity map Index list, covering all pages included in the set "Plan Approval Paragraph", see attached Detailed final construction plans shall contain the following: * Ail required street paving plans and profile sheets. * .All required storm drainage plans and profile sheets. * All required alley paving plans and profile sheets. * A complete and accurate drainage area map and detail grading plan. * All required letters of permision from adjacent property owners. * Ail required water and sewer engineering plans. Provide barricading plans... Provide trench.safety, sealed by a registered engineer in the State of Texas. Delineate proposed and existing water distribution system and pipe sizes. Delineate proposed and existing sewage collection system and pipe sizes Provide a Drainage Area Map covering two parts: a) show On-site Drainage Map, on a scale of 1" = 20', 40'. 50' etc. . ' with all details as required in the Subdivision Ordinance; b) show the Off-site Drainage Map, on a scale 1" = 100', 200', etc . . Delineate the project's boundary on it, plus the less detailed drainage system, to clearly demonstrate the affect of such activities, drainage outfalls, on the adjacent properties and the Drainage Master Plan. 9) lO) ~2) 1.3 ) ~4) ~6) ~7) all storm sewer systems must be designed for 100-year design frequency. Technical Paper 40 should be used to compute rainfall intensities, as per the Subdivision Ordinance, (Appendix "A", Page 30). Show the hydraulic calculations for each portion of the storm system on the profile, such as pipe size, Q100 (cfs), Qc (cfs), S, v (FPS) etc. . . Ail lots within or adjacent to the 100-year Floodplain shall have the lowest floor elevation for each building site shown on the site grading plans. A'permanent bench mark must be established with in a subdivision development, see attached Floodplain Development checklist. Each sheet of the plans shall contain a title block and consistent page numbers. Ail appropriate fees as per subdivision ordinance must be paid.~ Delineate a Revision block on each sheet. Revision dates must be shown on each sheet with Engineer's initials next to them. kll above comments must be addressed, prior to Staff's recommendation for approval of the final plat and plans. Provide a written response on all comments with explanations provided on items not addressed as requested above. . · / ., DRC/COM/~ENTS/ENG/FINAL SO/bb Page 3/3 PLAN APPROVAL PARAGRAPI[ RE: Pla~s Prep~ced by RE: RE: 1.~:~4 Rcv,b~iort dccCc She~ o6 Lc~,t Rcv,~iort (.k~Cc Con~.,~clz~on P£an4 and Spe~L~i~'~o~ E~e~'&Lvc cLcu'~e Tire above idem~L~ied pla~cs and spee, L~ica,'&ion~ have been ~cevi~uec/. and 6ound ~o bc in comp~ancc w~¢h 4kc app.~cblc Engincu~ng prou,~io~ of ~h.c MumL~pc~ Code o6 thc C~¢y 06 Copp~L&, Tczc~.s, Issuance 06 t~ ctpprov~ sh~L~ no~ bc D~,Lg~ E~.~inc~ 6~om ~ccb,CLb'dy 60~ ;eke ccd~qucc~y o6 ~[t~ d~,Lg~ ~.o~c 6~com .~ab,CLLey o,a~cd by o~. ~~ng 6rom ;CI'~ co~,'Ocuo~o~ o6 improv~m~m~ ~ p~covided 6o;c i~ th.c above spc~ficct doc~cm~. Shc~.~ no~ procc~ccl, umbel ;Cbc ow~.~uc hc~ c66e~cd ~omlo~ccr~c~ w~:k c~LL o.tk~Jc ctpp.~cccb.(~.~ prov,~io~ o~ tke Mu~Le~p~L Code of ,tko C,b'ty o~ eopp&LL'., Te.~ crud comp. LLancc an.y ethel ~L ~tcq~tcmc~'~ o6 4kc C.OCy of Copp~LL, 'Fc.~c~, rcq~ng any approvc~ of 4:Itc Plan,~.ng and. ZomLng Comm.~sios¢ and pos:t36rl, g o6 c~L bo~cls and d:hen scc~1.f.n.g an "App~e. ovc~f. ;t:o P2~.oceecl." 6~Lom .tltc~ C.~;ey Any ch. ange. s mu4~ be app/~.oued by :die approp/bLcv~e /~.e.~c~ory ageneic,~ c~ coed;8 c~ the C.Lty I:-r~!linC~. A~teJ~..the Oev¢;~opeJc's De~.Lg~ Engirm~. app~.ove4 .the. change, ;Cbc ¢~'Cy's assigrmd En~ine~ir, g '~m~pec;Cor sh~L8 be co,stub'Ced who wi~ ~tlz~ approve and/or secc~e approuc~ f~com tkc C~ty Engine~, m'~ wl~ch .Lime a su)op.~eme~t~ plan approved, w.L~ be a~fixed .~o th.c a. pp~coved plan.~, and ~.efe2~.e~.ced in a supp.~ememtm~, app~covr~L le;~:eJc by ;Cl~.e Cx';~y Engin¢.c,J~. A£.~ ~.evisioms w.bL~ be in~P. ucLed in ~he "As-Bm6~" plarb6 lo be su.bmx~b'Ced. 30 clays a~t~c Su. bstarbf~a~ compl~ion o(~ a~ pub.Lac improueme~¢'~. July 27, 1989 MEMORANDUM TO: FROM: RE: Russell R. Doyle, P.E., City Engineer Larry Davis, Construction Inspector PERMITTING PROCESS CITY OF COPPELL~- ENGINEERING DEPARTMENT 1) Approved Engineer 2) Approved Site Plan for Excavation 3) Pre-Construction Conference With The En§ineering Inspector Required Prior to Start of Construction 4) Excavation Permit Required 5) Utility Construction Permit Required 6) Paving Construction Permit Required Engineering Plans Required - Stamped & Signed by the City 7) Additional Permitting May Be Required - Other State, County and Federal 8) Early Rough Grading Must Be Approved Separately LD/lsg Construction City Departments, PERMTNG