Nlake 635(8)/SP,MP-DR 980528(6) itl
IlIELECTRIC
Comments for the City of Coppell
Development Review Committee
MAY 28 1998
,
~ ~at is not acceptable.
~/Easements will be required for proposed electric/gas facilities. A plat with
easement requirements will be provided to the developer.
'~Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
~Other comments ,d ~ /'7
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234