Loading...
Nlake 635(4)/Re-DR 970828 (6)"~'~E LEC TR I C Comments for the City of Coppell Development Review Committee g-reliminar~/Fi~,ai Plat Date Preliminary/Final Plat is not acceptable. //Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. ~/Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at ~-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234