Loading...
Nlake 635(4)/Re-AG 971014 AGENDA REQUEST FORM __~~ 'rna ¢~ ~t~ ^ i~-,-uti~ ~,,m CITY COUNCIL MEETING: October 14, 1997 ITEM ITEM CAPTION: PUBLIC HEARING: Consider approval of ReDlat and Site Plan of a Portion of Northlake 635 Business Park, to create a single lot that will allow the development of four warehouse/distribution facilities on 33.2 acres of property located at the southwest corner of Lakeshore Drive and Beltline Road. SUBMITTED BY: Gary L. Sieb TITLE: Director of Planning and Community Services STAFF RECOMMENDS: Approval ~ Denial STAFF COMMENTS: Date of P&Z Meetinq: September 18, 1997 Decision of P&Z Commission: Approved (7-0) with Commissioners Redford, Cruse, Kittrell, Lowry, McCaffrey, DeFilippo and Stewart voting in favor. None opposed. Approval subject to the following condition: (i) Modify the percentages of office space indicated for each building to match the provided parking spaces. APPROVED BY CiTY DATE DIR. INITIALS: ~%%), Agenda Request Form - Revised 1/97 FIN. REVIEW CITY MANAGER REVI! Document Name NL635.PZ CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT REPLAT AND SITE PLAN OF A PORTION OF NORTHLAKE 635 BUSINESS PARK, LOT 1, BLOCK B P & Z HEARING DATE: September 18, 1997 C.C. HEARING DATE: October 14, 1997 LOCATION: SIZE OF AREA: CURRENT ZONING: Southwest corner of Lakeshore Drive and Beltline Road. 33.2 acres; 4 Buildings, Total 530,800 combined square footage Building A: 67,200 s.f. Building B: 84,000 s.f. Building C: 170,000 s.f. Building D: 209,600 s.f. LI (Light Industrial) REQUEST: Approval of Replat and Site Plan to allow the development of 4 separate office/warehouse facilities. APPLICANT: HISTORY: Developer: Lincoln Property Company 3300 Lincoln Plaza 500 North Akard Dallas, TX 75201 (214) 740-3300 Planner/Engineer: Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, TX 75225 (214) 739-0094 On January 10, 1996, City Council approved a replat for 26.76 acres of this 33.2 acre tract of land. The plat never was recorded with Dallas County. This was the original site Haverty Furniture Company considered for its office/retail/distribution facility in Coppell before locating its facility on Gateway Boulevard. TRANSPORTATION: Beltline Road is an existing 6-lane divided major arterial in a 120' wide right-of-way. Lakeshore Drive is an existing C2U, two-lane undivided road built to standard in a 60-foot right-of-way. Item # 6 SURROUNDING LAND USE & ZONING: North South - East West vacant (proposed Vari-Lite office/warehouse facility); "LI" Light Industrial zoning vacant; "A" Agriculture North Lake; City of Dallas vacant; "A" Agriculture and "LI" Light Industrial COMPREHENSIVE PLAN: The Comprehensive Plan shows the property suitable for light/industrial showroom uses. DISCUSSION: Staff would like to commend the applicant for the overall design of the project. Orienting trucks courts away from the major thoroughfares, limiting the use of exposed aggregate walls to portions of the building concealed from arterials, and extensively landscaping both the perimeter and the interiors of the site greatly enhances the aesthetics of the overall project and creates a highly-appealing work environment. At the Development Review Committee, staff suggested that the applicant modify the percentages of office space indicated for each building to match the provided parking spaces. Currently, if the maximum office percentages were applied to each building, the applicant is short 18 parking spaces. The only other recourse the applicant would have is to obtain from the Board of Adjustment a special exception for the number of parking spaces. The zoning ordinance requires that planting islands shall be separated by no more than 15 parking spaces and the islands must contain at least one tree. The landscape plan does not show the planting islands for some of the elevations of Buildings "D" and "C", and trees must be planted in the planting islands. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends approval of the replat and the site plan subject to the following conditions: 1) Modify the percentages of office space indicated for each building to match the provided parking spaces. 2) Provide planting islands every 15 parking spaces. 3) Provide at least one tree each for all planting islands. 4) Overhead power lines along Beltline Road be removed, if possible. Item # 6 5) Compliance with Engineering comments. ALTERNATIVES: 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Replat 2) Site Plan 3) Building Elevation for Building A 4) Building Elevation for Building B 5) Building Elevation for Building C 6) Building Elevation for Building D 7) Landscape Plan 8) Irrigation Plan 9) Departmental Comments Item # 6 DEVELOPMENT REVIEW ENGINEERING COMMENTS ITEM: Replot and Site Plan o[ a Portion of Northlake 635 Business Parl~ (Co_i~ell Business Center H, Lot 1, Bloci~ 1), to create a single lot that will allow the development of four warelmuse/'dtstributlon fac?7'?_'_es on $$.2 acres of property, located at the southwest corner of Lakesbore Drive and Belt Line Road, at the request of Halff Associates, Inc. DRC DATE: August 28, 1997 and September 4, 1997 CONTACT: M~ MarUn, P.E., Assistant Ci~ Engineer COMMENT STATUS: o~r r~r~r~ ox, vr~ r /REVISED AFTER P&Z No Comments. EXCERPI FROM 9118/97 P&Z }ffiETING 1.1INUTES PUBLIC HEARING: To consider the approval of Replat and Site Plan of a Portion of Northlake 635 Bu._~n_~_s Park, (Coppell Bo~ness Center H, Lot 1~ Block 1), to create a single lot that will allow the development of four warehouse/distribution facilities on 33.2 acres of property located at the southwest corner of Lakeshore Drive and Beltline Road, at the request of Halff Associates, Inc. Planning and Zoning Coordinator Isabelle Moro introduced the item to the Commission, showing an exhibit and giving a brief history of the property, stating that this was the original site that Havertys considered for its office/retail/warehonse distribution facility before locating to Gateway Boulevard. She stated that the applicant is proposing to build four separate buildings, totalling approximately 530,000 square feet -- the two buildings fronting Beltline Road will house more office space and the interior buildings will house more warehouse/distribution space. Ms. Moro stated that over-all, the layout of this proposal is acceptable, however, the zoning requirement calls for planter islands, which contain at least one tree, to be located every 15 parking spaces, and these planter islands need to be added to Buildings C&D. She also stated that the applicant needs to match the percentage of planned office space to the parking spaces shown on the Site Plan. Ms. Moro stated that Staff recommends approval of the proposal, subject to the five conditions as listed on the Staff Report. A color rendering of the exterior facade of the building was shown to the Commission. Some discussion followed. Pat Acker, Halff Associates, Inc., 8616 Northwest Plaza Drive, Dallas, TX 75225, was present to represent this item before the Commission and answer any questions. He stated that the only Staff comment of concern is Condition No. 4 relative to the overhead power line removal. Discussion followed pertaining to the power lines and drainage easement. Chairman Lowry opened the Public Hearing, asking for people present who wanted to speak in favor of this request to come forward. Those speaking in favor were: There were none. Chairman Lowry then asked for people present who wanted to speak in opposition to this request to come forward. There were none. Chairman Lowry closed the Public Hearing. Minimal discussion followed. Page 2 of 2 Commissioner Stewart made a motion to approve the Replat and Site Plan of a Portion of Northlake 635 Business Park to create a single lot that will allow the development of four warehouse/distribution facilities on 33.2 acres of property located at the southwest comer of Lakeshore Drive and Belfline Road, subject to compliance with Engineering comments and the following conditions: (1) Modify the percentages of office space indicated for each building to match the provided parking spaces. (2) Provide planting islands every 15 parking spaces. (3) Provide at least one tree each for all planting islands. (4) Grant appropriate easement and/or right-of-way to accommodate future removal or relocation of overhead power lines when requested by the public utilities and/or the City. The motion was seconded by Commissioner Cruse; motion carried (7-0) with Commissions Redford, Cruse, Kittrell, Lowry, McCaffrey, DeFilippo and Stewart voting in favor. None opposed. · ,, Halff Associates lll ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS · SURVEYORS City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 October 1, 1997 AVO 16455T 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214) 739-0094 - 95 Attn: Isabelle Moro Re: Block B, Lot 1, Replat of Part of Northlake 635 Business Park Dear Ms. Moro: As requested please find attached Block B, Lot 1, replat of part of Northlake 635 Business Park for presentation at the October 14 City Council Meeting. The plat is as presented at the September 18 P&Z meeting. Based on our conversation with Mr. Tim Brancheau of TU Electric, the overhead electric lines along the west side of Beltline Road will be relocated to the east side of Beltline Road in the future. Additional easement space is not anticipated at this time. We will continue to coordinate this project with TU Electric as the design is completed. Thank you for your time and consideration in this matter. If you have any questions or require any additional information, please contact Mr. Pat Acker or myself at (214) 739-0094. Very truly yours, HALFF ASSOCIATES, INC. Todd Abbott, EIT Attachment DALLAS - FORT WORTH . HOUSTON · McALLEN TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL · ENVIRONMENTAL · STRUCTURAL MECHANICAL · ELECTRICAL · SURVEYING · GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE - LANDSCAPE ARCHITECTURE · PLANNING C 170,000 SF A 67,200 SF LANDSCAPE CONCEPT PLAN · · TABULATIONS: · Site Area: · Building Area: · Parking: · Coverage: 33.20 Acres 530,800 SF 822 Spaces 36.70% i I BELT LINE ROAD D 209,600 SF t0-15% Office 24' Cte¥ B 84,000 SF NORTH LAKE BUSINESS CENTER COPPELL, TEXAS v.,c. ,_T ¥ M^. (~ PLANT LEGEND LANDSCAPE TABULATIONS