Loading...
Nlake 635(3)/Re-DR 960829 (6)Date I m TIIELECTRIC Comments for the city of Coppell Development Review Committee V_:L~..~.~La~-yi~2z~]~_~..~a~ is not acceptable. asements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. /Loadinformation (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. ~/Othercomments ~;~ /~ t ~~~.~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234