Nlake 635(3)/Re-DR 960829 (6)Date
I m
TIIELECTRIC
Comments for the city of Coppell
Development Review Committee
V_:L~..~.~La~-yi~2z~]~_~..~a~ is not acceptable.
asements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
/Loadinformation (size of structure, A/C /
Heat
Load)
will
be required from the developer before easements can be
determined.
~/Othercomments ~;~ /~ t ~~~.~
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234