Loading...
Nlake 635(9)/FP-DR 861210MINUTES DEVELOPMENT REVIEW COMMITTEE December 10, 1986 DRC MEMBERS PRESENT: Taryon Bowman, Shohre Daneshmand, Steve Morton, Dale Jackson, Jackie Mayfield, Steve Goram, Richard Milner, Jerry Davis, Glen Fabian, and David Adams. Page 2 ENGINEER OR CONSULTANT: Jim Koch - Powell & Powell 3988 N. Central, Suite 1130 Dallas, Texas 75204 Developer, Engineer, Planner, Surveyor or and other Development Interests present: Second Review of: Jim Koch - Powell & Powell Northlake 635 Business Park - Final Plat Ae ENGINEERING: Contact Shohre Daneshmand @ 462-0022 Plat is accepted with stipulation of providing following: 1. Construction Cost Estimate 2. Maintenance Agreement 3. Final Plat is acceptable the Be BUILDING INSPECTION: Landscape plans must be signed and sealed by a licensed landscape architect. FIRE: Preliminary/Final Plats are acceptable. Future expansion will require fire lanes along southern and western portions of property. De LONE STAR GAS: No representative was present. GENERAL TELEPHONE: Final plat is acceptable. Need to contact Building and Industry Consultant (BIC) to discuss site entrance for telephone. Fo Ge Je Le Page 3 COPPELL CABLEVISION: Outside Service Area. U.S. POSTAL SERVICE: No representative was present. DEVELOPMENT INSPECTOR: No comment. TEXAS POWER & LIGHT: Service details to be worked out with building plans. Final plat is acceptable. Any questions, contact Glen Fabian @ 888-1382. PARKS AND RECREATION: No comment. PUBLIC WORKS: Unable to obtain comments from Public Works Department. Please contact Steve Goram, Public Works Director @ 462-0022. PLANNING AND DEVELOPMENT: Revisions must be submitted by 3:00 p.m. on Monday, December 15, 1986 to be eligible for December 18, 1986 Planning and Zoning Commission action. Please submit 22 copies and 3 reductions. This item is tentatively scheduled for December 18, 1986 Planning and Zoning Commission action. Please submit a written response to all comments in the form of a letter when corrections are returned.