Loading...
Nlake 635(9)/SPAm-CS000427WSI Architects ~____ ARCHITECTURE oi~q~NING o INTERIORS April 27, 2000 Mr. Gary Sieb, AICP Director of Planning and Community Services City of Coppell Re: McCollister Addition, Coppell, Tx. Project No. 9820 Dear Gary: Tim Adams with ICl Construction sent me a copy of your letter to him of April 7, 2000, wherein you referred to the sample of pre-fab concrete fence as an "Eddy Mann" stackable concrete fence. The "Eddy Mann" system as we understand is concrete poured in place and painted. The Superior Concrete system is pre-cast concrete with the color integral within the panel. No part of the system is painted. The "H" post are pre-cast concrete set in concrete piers, at 5 feet on center and the pre-cast panels span the 5 feet. There is nothing about the system to peel or deteriorate. In that we understood we had approval of this product and the material is on site, we are asking you and Greg Jones to reconsider your position by taking an in depth look at the system and it's durability. II I~.~1 ~1,.¥. Ray Gariq§0~AIA Executive Vice President cc: Tom Cook, United Properties Southwest Tim Adams, ICI Construction ::F Phone # ~ Fax # Fax # 6320 LBJ FREEWAY ~ SUITE ~8 o DALLAS, TEXAS 75240-6423 ::, 97~ -i5 - 9)9 ..; FAX 972 458-1566