1/8/86 Eng. ltr. re Final Insp.GINN, INC.
January 8, 1986
C(}NSI I,TIN(; ENI;INEERS
Mr. Steve Parsons
Northlake Woodlands Joint Venture
102 Meadowcreek, #101
Coppell, Texas 75019
Re:
Northlake Woodlands, Phase 6
Final Acceptance
Dear Mr. Parsons:
A final inspection of the above referenced project has been
confirmed by representatives of Ginn, Inc. and the City of
Coppell.
Pavin9 and utilities have been verified and are in compliance
with the City of Coppell standard requirements. As of this
date, permits can be issued to start construction of home
building.
The one-year maintenance bonds and as-built drawings have been
received from both contractors. Maturity on the bonds will be
one year from the date of this letter (January 8, 1987).
Sincerely,
GINN, INC.
Randy Fleming
Chief Inspector
/jc
CC:
Ed Powell, P.E., City Engineer/
Steve Goram, City of Coppell
Dale Jackson, " " "
Per Birdsall, " " "
H. Wayne Ginn, P.E.
PAVING
J. C. Boney Construction Co.
P. O. Box 59485
2700 Arbuckle
Dallas, TX 75229
243-2348 or 620-0922
UTILITIES
Crawford Utility Contractor, Inc.
P. O. Box 367
Rockwall, TX 75087
(214) 722-4333