Loading...
3/14/85 Engineering concernsGINN, INC. March 14, 1985 CONSULTING ENGINEERS Don A. Tipton, Inc. 6330 Belt Line Road, Suite C Garland, Texas 75043 Attn: Mr. Robert Porter Re: Northlake Woodlands East No. 6 Coppell, Texas Dear Mr. Porter: We have reviewed the construction plans and final plat for the above referenced project. We are recommending that the final plat be placed on the upcoming Planning and Zoning Commission agenda. Before we can recommend this item be placed on the City Council agenda, the following items need to be addressed: e e o Provide for future signalization at intersections of Moore Road and Mockingbird Lane with Bethel School Road by providing 4" diameter conduit under pavement. Please provide 12" diameter water mains along Mockingbird Lane from Bethel School Road to the north right-of-way of the railroad. Please provide 12" diameter water main along' Moore Road from Christi Drive to the north right-of-way line of the railroad. Please provide adequate gate valves and other appurtenances. Subdivision ordinance provides for maximum street slope of 5.0%. Some street centerline and curb slopes are excessive. In addition, some slopes at curb returns appear excessive. Plan and profile sheets show compacted fill being placed on existing ground with no stripping of topsoil. Please address. 5. Please refer to letter of February 15, 1985, concerning dedication along Moore Road. At culverts show actual profile of outlet ditches. Please incorporate Mockingbird Lane paving and drainage plans in this set. Has the design provided for drainage of lots where road- way fills are shown? 1613.5 Preston Road · Suite 106 · Dallas, Texas. 75248 · Phone 214/386-6611 At intersections with Moore Road, please provide street headers based on 37' b-b roadway width of Moore'Road and 20' curb radius. Plan and profile sheets for Moore Road are available for your use. 10. Sharp curves in sanitary sewer mains are not allowed. Please provide for straight or horizontal alignment between manholes. Vertical curves in sewer mains are not allowed. 11. Please provide or refer to details not shown such as sidewalks, pavers, conformance to City Streetscape requirements, etc. 12. The rainfall intensity of 7.8 in./hr, for a 100-year storm appear low. Please verify design of system for THD Bulletin 40 or City of Dallas criteria. 13. Pilot channels for open channels are required where applicable. Please provide for drainage easements for storm sewers and channels across platted lots. 14. Please consider relating storm sewer plan and profiles to paving plan and profile to provide stationing. 15. Provide water and sewer pipe conforming to subdivision ordinance. 16. Provide standard details and specifications for construction or make reference to applicable standards. 17. Please provide decorative headwalls and pedestrian rails at applicable culvert headwalls. 18. Street names (Cardinal, Robin, Eagle, and Dove) repeat other streets. 19. Please provide street lighting plan and streetscape plan. 20. Provide for density control of all roadway fills. 21. Please be advised that the owner will be required to pay all subdivision fees prior to final approval. Please feel free to contact this office concerning the above. ~incerely, ~V. Wankum, P.E. cc: Ron Ragland ae BJ DEVELOPMENT IMPACT ANALYSIS Northlake Woodlands East, No. 6 Date: 3-14-85 Rev. No: 0 General 1. Development Name and size: Northlake Woodlands East No. 6, 103.2 acres 2. Owner: Troth Enterprises 3. Engineer: Don A. Tipton, Inc. 4. Current zoning: SF 5. Current status of development: Final Plat 6. Location: East of Moore Road, at Bethel School Road 7. Proposed density: Flood plain-34 ac., 2.31 SF/Ac on remaining 8. Annexation or land study required: N/A 9. Issues resolved: None 10. Issues to be resolved: Minor utility problems, grading plans, and street names 11. Dedications required: Along Moore Road for slope easement, and dedication in flood plain for bridge Impact e e Traffic: a. Off-site collector streets: b. Off-site arterial streets: Sewer: a. Proposed mains: Several 8" Bethel Road, 920 VPD, Moore Road 280 VPD, Mockingbird 800 VPD Belt Line Road 900 VPD, Sandy Lake Road 700 VPD b. Proposed connections to existing mains: Connect to exist. 12" main in flood plain Water: Connect to existing 8" main in flood plain Drainage or Flow: Schools: a. Primary school: 150 students b. Middle school: 75 students C. Approvals and Fees 1. Fees: Item Final Plat Construction Permit Fee Water Availability Fee Sewer Availability Fee Parks Fees Required (when required) $ 3,740.00 2"~'"'"~'eere~ 2~ 13o, co 2. Assessments and Pro Rata Charges: Paid to date Item: Moore Road Improvements: $75/lf x 1360' = $101,964 Summary: b. Item: Summary: e Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: N/A N/A N/A 11-16-84 1~-84 11,-,8~ 3-16-85