Loading...
Nlake WE P9/FP-CS 850312GINN, INC. CONSULTING ENGINEERS March 12, 1985 DON A. TIPTON, INC. 6330 Belt Line, Suite C Garland, Texas 75043 Re: Preliminary Plat Northlake Woodlands East, Phase 9 Coppell, Texas Gentlemen: The above referenced plat has been received and reviewed by this office. We are recommending that it be placed on the next Planning and Zoning Commission agenda for consideration. We do, however, desire that the following points be addressed: Please provide an alley between this lot and Northlake Woodlands East, Phase 3. e A right-of-way dedication and slope easement will be required as shown on the enclosed sketch for Moore Road improvements. Please furnish this office with a legal description of the property so we may prepare the necessary descriptions. Please feel free to contact me concerning the above. Sincerely, GINN, INC. /n V. Wankum, P.E. Enclosure cc: Ron Ragland 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611 Date: Rev. No: 3-8-85 0 DEVELOPMENT IMPACT ANALYSIS Northlake Woodlands East, Phase 9 ao Be General 1. Development Name and size: Northlake Woodlands East, Phase 9, 1.92 acres 2. Owner: Louis T. Crump, Inc. - Coppell 3. Engineer: Don A. Tipton 4. Current zoning: SF-12 5. Current status of development: Preliminary plat 6. Location: East of Moore road, north of Meadowview 7. Proposed density: 1.92 acres/lot 8. Annexation or land study required: None 9. Issues resolved: None 10. Issues to be resolved: None 11. Dedications required: Alley on south side; right-of-way and construction easement on Moore Road Impact 1. Traffic: a. Off-site collector streets: Negligible b. Off-site arterial streets: 2. Sewer: a. Proposed mains: None b. Proposed connections to existing mains: 3. Water: Negligible flow 4. Drainage or Flow: not affected 5. Schools: a. Primary school: Negligible affect b. Middle school: Existing 8" in Phase I, connection only C. Approvals and Fees 1. Fees: Item ....... Preliminary plat Final plat Construction Permit Fee Water Availability Fee Sewer Availability Fee Parks Fees Required ~_~gquire~) $ 104.00 520.00 1,968.00 500.00 500.00 150.00 2. Assessments and Pro Rata Charges: To be determined a. Item: Summary: b. Item: Summary: Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: 3-8r~5