Nlake WE P12/FP-CS 900411DON A TIPTON,
CONSULTING ENGINEERS
ENGINEERING * SURVEYING * PLANNING
6330 Belt Line Road Suite C GARLAND, TEXAS 75043
3247
(214) 226-2967
April 11, 1990
Ms. Taryon Bowman
CITY OF COPPELL
255 Parkway Blvd.
Coppell, Texas 75019
Re:
NORTHLAKE WOODLANDS EAST NO. 12
Coppell, Texas
Dear Ms. Bowman:
Please find listed below our responses to the DRC meeting
comments of Tuesday, April 12, 1990, and the review letter from
Ginn, Inc., in reference to the above mentioned project.
C.
D.
E.
FINAL PLAT
We have identified the surrounding owners adjacent to the
proposed subdivision.
We defined the minimum finished floor elevation for the 100-
year flood plain.
We have changed the date on the plat.
We have added the utility signature block.
We have requested a waiver of centerline radius on Crestview
Court.
II. ENGINEERING PLANS
A. We have added 2" blow off valve at the end of the cul-de-
sac.
B. We have verified the existing location of the gas main, and
have shown the gas main on the plans.
C. We have relocated the manhole outside the paving.
D. We have delineated the minimum finish floor elevations for
sanitary sewer.
E. We will adhere to State Department of Health regulations for
water main and sanitary sewer main separation.
Ms. Taryon Bowman
CITY OF COPPELL
April 11, 1990
page 2
3247
Fe
We have provided an erosion control plan for design at the
discharge point of Grapevine Creek.
We have signed, sealed and dated all plans.
We have revised the water and sewer notes on the engineering
plans.
Please find enclosed three (3) complete sets of revised plans for
your use. If there are any questions or we can be of further
service, please call.
Sincerely,
Executive Vice President
/lc
encls.
xc: Mr. John Karlsruher
Mr. W. T. Troth