Loading...
Meadows P6/FP-CS 890628 PAUL S. UNZICKER, INC. CONSULTING I:"' NGI N E ERS 8700 STEMMONS FREEWAY, SUITE 400 DALLAS, TEXAS 7S247 (214) 634-3300 June 28, 1989 Mr. Larry Davis The City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Meadows Section Six - Phase One Coppell, Texas 86062 0 Dear Mr. Davis: We have revised the Final Plat and Engineering Plans for the referenced development consistent with your review comments found on the returned markups. The revisions to these plans can be found on the plan set submitted to you during our meeting on June 26, 1989. In addition to the revisions made to this plan set, the following should be noted regarding this project: The City Council has requested that the Paving Improvements associated with this project, especially in Samuel Boulevard, be completed prior to the beginning of the new school year. This was requested during the Final Plat process to ensure adequate safety and traffic flow around the elementary school located on the west side of Samuel Boulevard. Sidewalks are not required by City codes during Street Paving Improvements. The sidewalks for those interior streets of this subdivision will be constructed by the builders for each lot. The sidewalk in Samuel Boulevard will be constructed by the developer after all Street Paving is completed; the cost shared with St. Ann's Catholic Church. The church is also responsible for the sidewalk on the south side of Woodmoore Drive. The church is required to participate in this cost as requested by the City Council during the Platting process of their development. Be A trench safety plan and geotechnical investigation was conducted by Alpha Testing Service, Inc., especially for this project. A copy of the reports was submitted to you under separate cover and has been included in the Utility Contractors Contract Documents and Specifications. A preconstruction meeting will be scheduled next week. I would appreciate it very much if you would provide me with a list of all persons you wish to attend. During this meeting, we will notify contractors of any changes to the plans as originally approved, and of any concerns you wish to present to them. PAUL S. UNZICKER, P.E. DAVID M. SCHNURBUSCH, P.E. President Vice President Page 2 Mr. Larry Davis June 28, 1989 I appreciate your comments regarding this plan set and look forward to working with you during the construction phase of this development. If you have any questions, please call. Sincerely, Project Manager KRK: kc Gordon Jones / D.T. Construction, Inc. Jeff Hawkins / Pierce Lunsford, Inc. Russell Doyle / City of Coppell Kevin Pieffer / Ginn Inc. Howard Pofford / City of Coppell