Northpoint/SP,PP-CS001013~0/15/00 08:48 FAX 2147397086 HALFF ASSOCIATES ~001/002
· ,- Halff Associates, Inc
lllB '
ENGINEERS · ARCHITECTS · SCIENTISTS · PLANNERS · SURVEYORS
8616 Northwest Plaza Drive
Dallas, Texas 75225-4292
(214) 346-6200
Fax (214) 739-7086
MEMORANDUM
TO: AllAffendees
FROM:
Chris Amarante
Emaih camarante@halff,com
DATE: October 13, 2000
AVO: 19123
PROJECT: 121 @ Northpoint
SUBJECT: Cib./of Coppell meeting 10/04/00
This memo concerning development of the site located at SH 121 and Northpoint. Below are the items discussed:
Attendees: Andrea Roy - City of Coppell fax 972-304-7092
Marcie Diamond - City of Coppell fax 972.304-7092
Mike Martin - City of Coppell fax 972-304-3570
Greg Jones - City of Coppell fax 972-304-3570
Jess Pettit - Jackson Shaw fax 972-628-7444
Chri'.~ Gardner - Jackson Shaw fax 972-628-7444
Scotl McCrary - Gromatzky Dupree & Associates fax 214-871-9869
Daw; Littleton - Halff Associates, Inc.
Chris Amarante - Halff Associates, Inc,
1. Zoning LI (Light Industrial)
2. Setbacks 60' front, 10' back and sides
3. Possible 4' dock high on building 3. Li~ngth of the dock based on square footage of building or
zoning.
4. The ditch along Northpoint drive will be covered.
5. We need to coordinate with Travis Crump (Fire Marshall) regarding the fire hydrant locations and
fire lanes. Travis will also let us know about the pressures in the water lines. The possible need for
pressure reducing devise was raised by Jackson Shaw Company,
6. Inter-local agreement may be needed for: trash pickup, fire service(first response), police, building
inspection and post office,
7, Benchmarks - we may need to make a formula to convert between the two cities.
8. Det[~ctor checks will be required for each connection to the public water main.
9, Drive spacing for the Northpoint drives will be 120' for 40 mph.
10. We will need to add the following note for sidewalks on the plat; "4 foot wide sidewalks will be
con,,~tructed by the property owner when directed by the city engineer".
11. TxDot Contact - determine
12. Drainage detention should not be needed, only if the existing system will not handle the runoff.
13. Ea.~.ement will be needed for offsite drainage, if any.
14. Impact fees - office (3.99)*(SF/1000)*$300 warehouse (1.06)*(SF/1000)*$300
15. Impact fees for water and sanitary sewer based on size of meters.
16. Fee for detector checks is a fiat fee of $1125
50/13/00 08:49 FAX 2147397086 HALFF ASSOCIATES ~002/002
Bum
· " Halff Associates, Inc.
ENGINEERS · ARCHITECTS ' SCIENTISTS ' PLANNERS ' SURVEYORS
86'16 Northwest Plaza Drive
Dallas, Texas 75225-4292
(214) 346-6200
Fax (214) 739-7086
17. The plat must be filed for permits to be issued.
18. An early grading permit can be obtained once the prat and site plan have been sent through P&Z. The
conditions for an early permit for grading are: P&Z must have no major changes, a hold harmless letter
submitted, and a 2% fee paid.
19. Preliminary plat and site plan duration 120 days.
20. Current codes used by the City of Coppell: 1994 UBC, 1994 Mechanical, 1991 Plumbing, 1993 National
Electric, 1994 Fire. The 2000 IBC may be adopted this fiscal year.
21. A tree survey will be required to locate trees with a diameter of 6" or greater.
22. Kimly-Horn is designer of future Fellowship Church c..0nstruction.