Loading...
121 BP/SP,Re-DR 981229 (3)ITEM: One Twent~ One Business Park, Replat of Lots 1 and 2, Phase I, Block 1, and Site Plan Review of Lot 2, Block 1, to allow the creation of two lots, and the development of 4 office buildings totaling 163,614 square feet on Lot 2, located at the southwest corner of Coppell Road and Corporate Park Boulevard, at the request of Gromatd~y, Dupree and Associates, Ina DRC DATE: December29, 1998 and January 7, 1999 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT STATUS: .,r' PRELIMINARY 4. 5. 6. 7. 8. 11. Water vault easements need to be 20' x 20'. Water easements need to be 20' wide. Note that all utility construction going under existing concrete paving will be made via dry bore. Brick paver bands will be 8' wide. ADA compliant ramps will be constructed at all sidewalk-driveway intersections. Make sure proposed water vault at west end of property is not under pavement. Provide wastewater access device at right-of-way line for Sanitary Sewer services, Show a north arrow on the utility layout. The landscape plan and the utility layout show an irrigation meter in different locations. Please make the plans consistem. Indicate right-of-way width for adjacent streets. Reference City of Coppell Standard Construction Details for all utility and paving requirements. The City of Coppell Thoroughfare Plan shows the future extension of Freeport Parkway aligned in this area. The City recommends construction of a street through this site that would connect Corporate Park Drive to Freeport Parkway in the future.