Loading...
Northpoint/SP,PP-DR010222 City of Coppell Development Review Committee Comments Planning DePartment NORTHPOINT ADDITION LOT BLOCK 1 SITE PLAN AND PRELIMINARY PLAT SOUTHEAST CORNER OF NORTHPOINT AND S.H. 121 DRC Date: February 22, 2001, March 1, 2001 Planning & Zoning Commission Meeting: March 15, 2001 City Council Meeting: April 10, 2001 PRELIMINARY PLAT Revise label on plat showing a 15' building setback along the rear property line; the rear yard setback is required to be 10'. Revise label on plat showing a 30' setback along the west front property line (adjacent to 121); the front yard setback with parking is required to be 60'. Revise notation of 5' parking setback along the east side property line-the ordinance does not reference side yard parking setbacks. Per Section 12-25-4 All parking shall be located at least 30' behind the front property line and five feet from the rear property line. Indicate curve radii for fire lanes throughout the site. Eliminate notation to the Deputy City Secretary on page two of the plat; the plat should reference the City Secretary. If necessary the City will add in the word Deputy. Eliminate signature line for TXU Pipeline on page two of the plat; this signature line is not necessary. Indicate what will happen to the existing 30' access easement to adjacent church. It must noted on plat-shift, abandon, etc. SITE PLAN Clearly define the Phase I and Phase II lines. As shown, there is a portion of the parking lot that is shown to be constructed with rows of parking that will terminate mid-space and mid-row. See Phase lines. Staff would recommend that the location of the dumpster serving Building//2 be revised. The view of the dumpster could be obscured by moving it to the rear of the building-shifting it west. Again, eliminate reference to a 5' side yard parking setback-See//3 above. Provide details on the proposed dumpster enclosures. Underground/conceal existing inlet at the northwest comer of the property, in order to continue perimeter landscaping to the edge of the property. Provide additional information regarding existing Elaeagnus along the southern property line. Landscape Tabulations provide the number of 275 Elaeagnus; 10. 11. 12. however, staff is unclear whether this is the amount of existing shrubs or the amount with additional shrubs installed. Comply with Section 34-1-8 (B.3) "Planting islands shall be located at each terminus of each single row of parking and, when a single row of parking contains more than 15 spaces, at intervals between each terminus. Planting islands shall contain at least one tree". This occurs in numerous locations throughout the site, please remedy. Revise Landscape Calculations to show the required and provided number of Planting Islands. See Section 34-1-8 B.3 "12% of the total number of parking spaces." Additionally, please note that a double row of parking shall terminate with a planting island containing two trees. Please note that Perimeter trees are planted over the front 15' drainage easement- once grading/drainage plans are reviewed the City will determine if trees may be planted in this location. Clearly indicate the species of the existing trees to be removed on site. A note is provided that existing 3" Cedar Elm is to be removed, but are all trees Cedar Elms? Hackberry Trees can not count toward Perimeter Landscape Requirements. While existing, these trees are not permitted according to the City's Plant Palette. Additional trees must be installed in order to fully comply with the Perimeter landscape requirements. Comply with Section 34-1-8 C Perimeter Landscaping along the east side property line. All off-street parking, loading and vehicular use areas, including driveway pavement, shall be screened from all abutting property and/or public rights-of-way by a wall, fence, hedge, berm or other durable landscape barrier. Plants and materials used in living barriers shall be at least thirty (30) inches in height at the time of planting... Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the March 1st Development Review Committee (DRC) meeting. Each applicant will bring two new sets of revised plats and plans to the March 1st DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tuesday, March 6t~ to resubmit fourteen (14) folded copies of revised plans and three (3) reduced paper copies (8 1/2 X 11) of each exhibit to the Planning Department