Loading...
Northpoint/SP,PP-DR010222 (2)DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Northpoint Addition, Lot 1, Block I, Site Plan and Preliminary Plat, request to allow the construction of two office/warehouse buildings totaling 137, 000 square feet on 9.081 acres of property located at the southwest corner of Northpoint Drive and S.H. 121, at the request of the Jackson-Shaw Company. DRC DA TE: February22, 2001 and March 1, 2001 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT STATUS: ~PRELIMINARY 1. If sidewalks will not be constructed at this time, then a note needs to be provided on the plat stating the following: "Sidewalks to be constructed by the property owner when deemed necessary by City Engineer." 2. Provide a preliminary grading and drainage plan. 3. Easements need to be provided for proposed water meters and vaults. 4. Provide a 10'xl0' right of way corner clip at Northpoint Drive and SH121. FEB 2 3