Loading...
Paragon/SPRv-DR 980827 (6)~ TUElectric ~ ~ --*-_ L--6-~~~ Texie Utllltl®8 Comp~ni®s Comments for the City of Coppell Development Review Committee Preliminary/Final Plat for __Preliminary/Final Plat is not acceptable. __Easements will be required for proposed electric/gas facilities. A plat with easement requirements will be provided to the developer. __Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. er comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmem Branch, Texas 75234