Paragon/SPRv-DR 980827 (6)~ TUElectric ~
~ --*-_ L--6-~~~
Texie Utllltl®8 Comp~ni®s
Comments for the City of Coppell
Development Review Committee
Preliminary/Final Plat for
__Preliminary/Final Plat is not acceptable.
__Easements will be required for proposed electric/gas facilities. A plat with
easement requirements will be provided to the developer.
__Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
er comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmem Branch, Texas 75234