Park N Fly/FP-CS 930706To: From: RE: Date: Taryon Bowman, Planning and Zoning Coordinator Kenneth M. Griffin, P.E., City Engineer [-~ Engineering Comments for DRC 6/24/93 & 7/1/93 July 6, 1993 S-1067-SUP Request for gift shop - located at 416 Bethel Road, at the request of Phillip Jewett. We briefly reviewed this request at the July 1, 1993 DRC meeting. The Engineering Comments were as follows: Escrow should be provided for the section of the property adjacent to Bethel Road. It was noted that the property is not being platted, therefore, the Engineering Department would like to pursue the use of the same type of agreement that we utilized for the Chambers Addition i.e., no money switching hands at this time but the property owner acknowledges that they will pay their fair share at some point in the future. 2. The Parking should be correctly shown and dimensioned on-site for both customer and employees. ® Replat of Country Estates Block A, Lot 3 - located at 472 Country Estates Lane. The Engineering Department had a concern whether or not the property owner of Block A, Lot 4 had been contacted about revising their drainage easement. Staff has reviewed the supporting documentation for the deletion of a portion of the drainage easement and does not have a problem with it. However, it is our understanding that this has been withdrawn from consideration. ® Park and Fly Addition, preliminary plat - located at the northeast corner of Royal and Cotton Road. 1. Sidewalks are required along Royal Lane. 2. The drive return radius should be a minimum 10 foot. 3. The width of the driveway should be shown and because of the width, a median should be provided for separation of egress and ingress traffic. e Brick pavers should be provided along the driveway per the Streetscape Plan. Changes to Gateway Blvd. and Royal lane should be constructed per the Thoroughfare Plan. A variance should be requested for the parking space sizes. Escrow will be required for the portion of the property adjacent to Gateway Blvd. The water and sanitary sewer should be looped. The Engineering Department raised an issue at the July 1, 1993 DRC as to whether or not the developer of this property should extend the 12" sewer line on the north side of the property as shown on our sewer master plan. I have reread the letter supplied by the applicants concerning the extension of the utilities and it specifically talks about an 8" sewer line in Gateway and Cotton. Therefore, they have not at this point agreed to extend the sewer line. However, some consideration should be given to the extension of the sewer line at this time. The drainage has been revised to include underground drainage. However, there still needs to be contact made with the property owner to the east (Cattellus) to obtain permission to grade to drain onto their property and discharge the water. 10. Proposed elevations for the parking lot should be provided. 11. Utilities should be provided to the van service building. Austin Place f'mal plat - located 250 feet north of Sandy Lake Road, along the east side of Moore Road. 1. Moore Road should be built with this development. 2. Curves 3 and 4 fall below our minimum requirement. Therefore, a variance should be requested for those two centerline radius. 3. Twenty-five foot should dedicated for Sandy Lake Road (55 foot from centefline of existing Sandy Lake Road). 4. Street names should be provided. 5. The drainage issue needs to be addressed and resolved prior to final approval of this plat. ® Latter Day Saints Addition Block A, Lot 1 preliminary plat - located approximately 1056 feet from the southwest corner of MacArthur Blvd and Samuel Blvd. Drainage easements should be provided for the on-site drainage system. I am concerned about the drainage plan as submitted and feel that it could cream a problem in the future if it is allowed to be constructed as submitted. They are currently purposing to cut a "temporary'' ditch on the northwest side of the property to route the water to a Y-inlet and then pick it up and take it parallel to MacArthur Blvd. to the existing storm drain system. The prospect of a open ditch for a period of time is unacceptable. e Utility plans should be provided. They should !nclude. the public~ sewer line that will go off site onto the school property. We need to see real drainage plans that include the proper collection of off-site drainage. Also, any drainage system that transverses this property that will be conveying water from another site should be contained within a minimum 20 foot drainage easement. file/meetings/dfc0624.93