Loading...
Northpoint ROW/PP-DR 960829 (7) I ! "~ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/F-in~_! Plat for Date ~ '- ~'- ~ ~ ~/ Preliminary/~l Plat is~ acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234