Northpoint ROW/PP-DR 960829 (7) I !
"~ELECTRIC
Comments for the City of Coppell
Development Review Committee
Preliminary/F-in~_! Plat for
Date ~ '- ~'- ~ ~
~/ Preliminary/~l Plat
is~ acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234