Park Meadow P1/FP-CS 850124GINN, INC.
January 24, 1985
CONSULTING
ENGINEERS
Wiseco Land Development Co.
6350 LBJ, Suite One
Dallas, Texas 75240
Re: Park Meadow - Section One
Final Plat/Construction Plans
Gentlemen:
We have reviewed the construction plans for conformance with the City of
Coppell standards. We have no objections to the utilities as shown. We
have some reservations about allowing 0.3% slope on the paving plans. After
talking to the engineers, they have assured us that due to controlling points
along Parkway Boulevard and the flood prone area to the north of the project,
minimum grades of 0.3% was required to make the project feasible.
We will agree to allow 0.3% slope with the stipulation that the owner and
his engineer will be fully responsible for quality control on the paving to
assure that there are no "bird baths, reverse slopes, etc." on the finished
product. The City will not accept the project and issue building permits
until it is satisfactory.
We have recommended approval of the final plat and placing it on the next
agenda.
Sincerely,
H. Wayne Ginn, P.E.
City Engineer
/sr
cc:
Ron Ragland, City Manager
Mark Sweeney
Threadgill-Dowdy
Univest
16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611