Loading...
Park Meadow P2/FP-CS 850508A® Be Date: Rev. No .' 5-8-85 0 DEVELOPMENT IMPACT ANALYSIS Park Meadow, Section Two General 1. Development Name and size: 20.677 acres 2. Owner: Wiseco Land Development 3. Engineer: Threadgill-Dowdey 4. Current zoning: SF 5. Current status of development: Final plat 6. Location: NW corner, Parkway Blvd. and Moore Road 7. Proposed density: 4 lots per acre 8. Annexation or land study required: N/A 9. Issues resolved: Minor item 10. Issues to be resolved: Minor items 11. Dedications required: None Impact 1. Traffic: a. Off-site collector streets: b. Off-site arterial streets: 2. Sewer: a. Proposed mains: 8" min. b. Proposed connections to existing mains: 3. Water: 8" connect to 16" at Parkway Blvd. 4. Drainage or Flow: Drain to Cottonwood Creek 5. Schools: a. Primary school: 60 students b. Middle school: 30 students Parkway Blvd. 400 vpd MacArthur Blvd., Sandy Lake Rd. 10" MUD main C. Approvals and Fees 1. Fees: Final Plat Water Availability Fee Sewer Availability Fee Construction Permit Fee Park Fund Fees Required (when required) $ 2,120.00 40,500.00 40,500.00 21,194.00 12,150.00 Paid to date 2. Assessments and Pro Rata Charges: Se Item: Street lights Summary: To be determined be Item: Street signs Summary: 8 ea. at $143.75 = $1,150.00 Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: 5-8-85