Park Meadow P2/FP-CS 850508A®
Be
Date:
Rev. No .'
5-8-85
0
DEVELOPMENT IMPACT ANALYSIS
Park Meadow, Section Two
General
1. Development Name and size: 20.677 acres
2. Owner: Wiseco Land Development
3. Engineer: Threadgill-Dowdey
4. Current zoning: SF
5. Current status of development: Final plat
6. Location: NW corner, Parkway Blvd. and Moore Road
7. Proposed density: 4 lots per acre
8. Annexation or land study required: N/A
9. Issues resolved: Minor item
10. Issues to be resolved: Minor items
11. Dedications required: None
Impact
1. Traffic:
a. Off-site collector streets:
b. Off-site arterial streets:
2. Sewer:
a. Proposed mains: 8" min.
b. Proposed connections to existing mains:
3. Water: 8" connect to 16" at Parkway Blvd.
4. Drainage or Flow: Drain to Cottonwood Creek
5. Schools:
a. Primary school: 60 students
b. Middle school: 30 students
Parkway Blvd. 400 vpd
MacArthur Blvd., Sandy Lake Rd.
10" MUD main
C. Approvals and Fees
1. Fees:
Final Plat
Water Availability Fee
Sewer Availability Fee
Construction Permit Fee
Park Fund
Fees Required
(when required)
$ 2,120.00
40,500.00
40,500.00
21,194.00
12,150.00
Paid to date
2. Assessments and Pro Rata Charges:
Se
Item: Street lights
Summary: To be determined
be
Item: Street signs
Summary: 8 ea. at $143.75 = $1,150.00
Approvals
a. Annexation
b. Land study: P&Z, City Council
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer:
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer:
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period:
5-8-85