Park Place/PP-CS 900427UNIVEST DEVELOPMENT COMPANY
April 27, 1990
Mr. Alan D. Ratliff
City Manager
City of Coppell
P. O. Box 478
Coppell, Texas 75019
Re: Construction of Road and Utility Improvements
Park Place Addition and Heartz Road
Dear Mr. Ratliff.' ~f
As you know, the preliminary plat for the Park Place Addition has recently
been approved at the request of the Park Place Joint Venture, and the construction of
Heartz Road and its associated utilities has been previously approved by the City upon
request of ABQ Development Corporation ("ABQ"), which is now under the
conservatorship of the Resolution Trust Corporation ("RTC"). The Park Place Joint
Venture has agreed to consider taking over the construction of Heartz pursuant to a
recently negotiated agreement with ABQ and the RTC as their managing agent. As
one of the conditions in the land acquisition contract for the Park Place Addition and
for the possible assumption of the Heartz Rd. cons~truction, we need to obtain the
City's confirmation of the matters described herein.
The Park Place addition may be final platted in two phases. On the enclosed
preliminary plat is marked the division line between the 1st and 2nd phases. The 1st
phase will front on Sandy Lake Road and will be developed while Heartz Road and the
utilities with Heartz are also being constructed by the Park Place Joint Venture.
As a part of the Heartz construction, a new sanitary sewer line will be
constructing a new sanitary sewer line in the Heartz right-of-way. The sanitary
sewer service to the 1st phase of Park Place is planned to be provided through a
sewer line which will be constructed from the west boundary of the first phase,
across the 2nd phase land, to the new Heartz Road sewer line. The Heartz Road sewer
line should be completed several months before phase 1 of Park Place is completed.
The drainage facilities being constructed in Heartz Road deliver storm drainage
into a recorded drainage easement which is for the benefit of ABQ, the Parks of
Coppell Joint Venture and their assigns (the "Mutual Drainage Easement"), a copy of
which is enclosed herewith. The storm water drainage from the 1st phase of Park
Place is planned to be discharged at the west boundary of phase 1 into an interim
earthen drainage channel, across the 2nd phase land, into the already existing
interim earthen channel which is in the Mutual Drainage Easement. The Mutual
Drainage Easement abuts the northwest corner of the 2nd phase land.
In the next few days, our engineer will submit to the City a proposed Interim
Drainage and Utility Easement which covers the location of the sanitary sewer line
and earthen drainage channel described in the preceding paragraphs. This easement
UNIVEST FINANCIAL CORP. · ALLEN EQUITIES INC.
12770 COtT RD. · SUITE 1215 · DALLAS, TEXAS 75251 · 214/233-5771
Mr. Alaa D. Ratliff
April 27, 1990
Page Two
follows the alignment of Park Valley Drive on the preliminary plat since the
sanitary sewer line and permanent drainage improvements will ultimately be located
in that right-of-way when phase 2 is developed.
We hereby request the City's written confirmation of the following:
1. Conceptual approval of the above described system for providing sewer and
drainage services to the 1st and 2nd phases of the Park Place Addition. We
understand that the City must review and approve the final engineering documents
for such facilities, which will be submitted along with the final engineering for
each phase of the development.
2. That the Mutual Drainage Easement may be used to provide storm drainage
discharge points for Heanz Rd. and for the Park Place Addition.
3. That the approved plans for Heartz Rd. reflect all of the requirements of the
City for the construction of Heartz and its associated utilities, that there are no
further special requirements imposed by thc City on this project, and that the City
shall accept the construction of Heartz Rd. as completed upon the performance of the
work reflected in the approved plans in a workmanlike manner and in conformity
with the normal city standards.
If the City confirms that the above listed three statements correctly reflect the
City's position, please so indicate by an authorized signature in the space provided
below. If you have any questions, please let me know. Thank you for your
consideration.
Sincerely,
U~.i, vest Development Company
Michael R. Allen, President
ACCEPTED AND AGREED:
CITY OF COPPELL:
Alan D. Ratliff, City Manager
Date:
CC.'
Dan Dowdey and Associates, Consulting Engineers
Richard Dooley
Mary Hicks, ABQ Development
AR/ABQ/4.27.90
-.%