Loading...
Park Place/FP-CS 910321DAN M. DOWDEY AND ASSOCIATES, INC. CIVIL ENGINEERS 18250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 Mr. Gary Sieb Director of Planning City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: FINAL PLAT PARK PLACE ADDITION AN 88 LOT RESIDENTIAL ADDITION March 21, 199 Dear Gary: Per our conversation yesterday regarding the submittal of the final plat for signatures by City Officials, I am requesting that the City of Coppell extend the six (6) month period an additional six (6) months. As you know construction is proceeding and I anticipate paving construction to occur within the next two weeks. We are requesting the extension in time so that we can eliminate "easement relocations" etc. which seem to occur on most subdivisions. I anticipate that we will be submitting the final plat within the next two months, however, the six month extension would adequately cover the construction time-frame expected. If you feel we should submit the final plat now, please let me know. Thank you. Very truly yours, WAA :hc