Park Place/FP-CS 900917 (2)Street Sign Assessment
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE~
No Parking $53.10 0 $ -
Speed Limit 63.54 19 1207.26
Yield 58.56 0 -
Stop 65.12 0 -
Street Name 11.60 0 -
Stop & Street Combo 96.85 8 774.80
Total $1982.06
100% Due prior to acceptance of subdivision.
Street Light Assessment
$292.60 per light for every 200 feet of roadway.
You are being assessed for 5377 ft. of roadway, which totals to 26
lights.
$292.60 x 26 lights = $7,607.60
100% Due prior to acceptance of subdivision.
Roadway Assessment
The above referenced subdivision fronts Sandy Lake Road for the
length of 678.32 feet. Approximate cost of a four lane divided
road in a six lane R.O.W. for this project is:
678.32 F.F. x $170.40 (Per F.F.) = $115,585.73
100% Due prior to final acceptance of the
infrastructure.
subdivision
Construction Permit Fee
$730,725 project cost x 2% = $14,614.50
100% Due at time of pre-construction conference.
cc:
Frank Trando, Finance Director
Gary Sieb, Planning and Zoning
Dale Jackson, Building Inspections