Loading...
Oakbend Add/FP-CS 900604GINN, INC. CO N S I I1/1'I N (; E N (; I N E E il S Date: To: From: Re: PLAT/PLAN REVIEW MEMORANDUM June 4, 1990 Steve Goram, Director of Public Works John C. Karlsruher, P.E. Review Comments for the Final Plat and Plans for the Oakbend Addition FINAL PLAT: 1. R.O.W. widths on surrounding streets are not shown. 2. Property/R.O.W. lines missing in a few areas. 3. Street center line curve radii below minimum 425' are used in curves 18, 21, 22. Variance required if not changed. 4. Development along Thweatt Road must comply with Streetscape Ordinance Primary Image Zone. 5. Legal description and actual dimensions on plat vary from one another. 6. Floodplain Development Permit note and blanks needed on final plat. PLATTING AND PD REGULATIONS: 7. Contribution for improvement of 1/2 o6 Freeport Parkway as an M6D is too low. 8. Contribution for improvement of 1/2 of Thweatt Road required. 9. 10' access easement from Post Oak Drive to the proposed park must be shown on final plat. PAVING PLANS: 1. Street R.O.W. and paving widths not shown on Sheet 2. 2. Post Oak Cul-de-sac has insufficient radius. Minimum radius is 40' to face of curb. 3. Center line curve data is required to be shown on paving plans. 171(]3 l'rcsloq l,l,uad · ,quilt I00 · I,!1 I1R · 1)all;~,~,'l'cxas 7524~I '~ I"hCmc 214/2,i8-4g00 4. Alley pavement/R.O.W, widths not shown on Sheet 9. 5. Street pavement/R.O.W, widths not shown on Oakbend Drive on Sheet 10. 6. Alley pavement/R.O.W, width required on Sheet 15. DRAINAGE PLANS: 1. Line "A" shows flow line to flow line connection at pipe size change from 48" to 30". Crown to Crown connection required. 2. Title blocks and sheet number information not complete. WATER AND SEWER PLANS: 1. All water lines shall be profiled as required by a new Public Works Department policy. 2. Sanitary sewer Line "A" must be realigned to provide a minimum separation of 9' from the proposed water line. 3. Easements will be required as marked on the drawings. 4. All sanitary sewer lines and water lines must have a 9' minimum separation. 5. 2" blow-offs must be installed at the dead ends of the 8" water lines serving the Beale Lane and Post Oak Drive Cul- de-sacs. 6. All drop manholes shall have the drop pipes encased in concrete. FEES DUE: A. Water and Sewer Availability Fee @ $440/unit 1/2 due prior to city Council consideration 138 lots x $440/lot = $60,720.00 1/2 = $30,360.00 due now B. Water Tap Fee @ $100/meter Due prior to issue of building permits 138 lots x $100/lot = $13,800.00 C. Sewer Connection Fee @ $100/sewer connection 100% due prior to issue of building permits 138 lots x $100/lot = $13,800.00 Construction Permit Fee First deposit @ $500 + $20/lot = $500 + $20 x 138 = $3,260.00 due now Second deposit in an amount equal to 1.5% of the estimated construction cost of the items proposed to be dedicated to the city. This is due prior to issuance of a construction permit. Park Fund @ $150/SF home 100% due prior to final plat approval 138 lots x $150/lot = $20,700.00 DUE NOW Fo Street Light Fee @ $292.60 per light for every 200 feet of roadway. This fee is due prior to final acceptance of the subdivision. Review with Coppell Public Works Street Department. Go Street Sign Fee as required by the Street Department in accordance with attached guidelines. Due prior to building permits being issued. Review with Coppell Public Works Street Department. TOTAL OF FEES DUE AT THIS TIME = $54,320.00 For questions regarding comments made by Public Works or Engineering Department staff contact the following: Water and Sewer - Water Superintendent, Mr. Howard Pafford, at 214-462-8495. Streets - Streets Superintendent, Mr. Per Birdsall, at 214- 462-8495. Parks - Parks Superintendent, Mr. Richard Diano, at 214-462- 8495. 4. Engineering - John C. Karlsruher, P.E. , Ginn, Inc. Consulting Engineers at 214-248-4900. Should there be further questions on policy or disputes which may need to be resolved, please contact Mr. Steve Goram, Director of Public Works, at 214-462-8495.