Loading...
Nlake 635(11)/SP-DR 980430 (5) // I I TUELECTRIC Comments for the City of Coppell Development Review Committee Prz!!nxlamy/Finai Plat Date 4-30-98 __Preliminary/Final Plat is not acceptable. asements will be required for ~ electric/gas facilities. A plat with easement requirements will be provided to the developer. __Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. __ Other comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234