Loading...
Park W CC(9)/Re-DR 960425 (5) m m ELECTRIC Date Comments for the City of Coppell Development Review Committee ~Prcli~,~-~~_] PI~-~ is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Othercomments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Tex~ 75234