Loading...
ParkW CC-13/Re-DR 941027 (6)TUELECTRIC Comments for the City of Coppell Development Review Committee · ary/Fln for Date 10-27-94 · / Pr~ii~Lin&r~f-½Uin&3~-~i~ is not acceptable, jf Easements will be required for proposea electric facilities. A plat with easement requirements will be provided to the developer. ./~oad information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234