Loading...
ParkW CC-1/FP-CS 900315 (2)Minutes of March 15, 1990 Planning & Zoning Commission Page 3 Item 7: Following discussion Commissioner Redford moved to approve Case #ZC-524. Commissioner Gross seconded the motion: motion carried (6-0) with Chairman Munsch and Commissioners Green, Gross, Redford, Scott and Tunnell voting in favor of the motion. pLATTING Consider approval of a final plat for Meadows Addition, Section 6, Phase 2, located at the southeast corner of Parkway Boulevard and Samuel Boulevard, at the request of Meadowglen Properties. P&Z Coordinator Taryon Bowman introduced the item to the Commission. Ms. Bowman stated this plat is actually Phase 2 of the Meadows Addition, or Case #PD-105. If approved, this plat will allow the construction of thirteen single-family structures on 2.68 acres. She further stated that all DRC comments have been addressed; therefore, staff has no objections to the plat. Mr. Glen Hinckley was present to represent this item before the Commission. He stated that all utilities are already in place, and that this property should have been included with the final plat with D.R. Horton's project directly adjacent to this property. Mr. Hinckley stated that it was due to an oversight that this property was not included. Following discussion Commissioner Tunnell moved to approve the final plat for the Meadows Addition, Section 6, Phase 2. Co~missioner Scott seconded the motion; motion carried (6-0) with Chairman Munsch and Commissioners Green, Gross, Redford, Scott and Tunnell voting in favor of the motion. Item 8: Consider approval of a final plat for Park West Commerce Center Addition (formerly Gateway Park @ Coppell), located at the southwest corner of Southwestern Drive and Beltline Road, at the request of Prentis/Copley Properties. Director of Planning Gary L. Sieb introduced the item to the Commission. Mr. Sieb stated that this is a 328 acre tract, with the preliminary plat already approved. He also stated that staff would recommend approval of this final plat, however, he would like to point out that the Public Works Department has several concerns, as outlined in their memo dated March 14, 1990. Mr. S/eh also stated that the applicant has included a letter dated March 15, 1990, which says that they do agree to follow through with all their construction drawings and everything will be submitted for City approval within ninety (90) days of this plat going to City Council. Minutes of March 15, 1990 Planning & Zoning Commission Page 4 DttAFT More specifically, Mr. Sieb mentioned that the letter dated March 14, 1990, and signed by Mr. Michael Tucker, Vice President of Prentis, stated that all construction drawings would be complete and submitted for City approval no later than July 16, 1990. Mr. Sieb also stated that Public Works has taken the stand that sidewalks do need to be provided throughout this entire project. Mr. Mike Tucker of Prentiss Properties was present to represent this item before the Commission. Mr. Tucker stated that they feel they have worked out all of staff's concerns with their letter dated March 15, 1990. He also stated that they had drawn the plat to be consistent with the Thoroughfare Plan, which has a six-lane right-of-way. He further stated that if Council reduces the right-of-way to four lane divided, they would ask Council to approve the plat with the condition that the right-of-way be reduced to four-lane divided. Following discussion Commissioner Gross moved to approve the final plat for Park West Commerce Center with the condition that they complete all the requirements outlined in the memo from the Public Works Department, dated March 14, 1990, (ATTACHED) and with the agreements stated in Mr. Tucker's letter of March 15, 1990 (ATTACHED). Commissioner Redford seconded the mot/on; motion carried (6-0) with Chairman Munsch and Commissioners Green, Gross, Redford, Scott and Tunnell voting in favor of the motion. Item 9: Consider approval of a preliminary plat for Gateway Business Park Addition, located at the northwest corner of Freeport Parkway and I.H. 635, at the request of Santa Fe Realty. Director of Planning Gary L. Sieb introduced the item to the Commission. Mr. Sieb stated that this subdivision plat also relates to the thoroughfare amendment. He also stated that this is a 103.82 acre tract of land, and that staff recommends approval of this preliminary plat. Mr. Weldon Davis of Santa Fe Pacific was present to represent this item before the Commission. Mr. Davis stated that he felt the plat was basically a very simple request, and that they have no problem agreeing with staff conditions. Me further stated that they will request Council to override the decision of the Planning Commission to require a four-lane divided roadway, and instead ask Council to approve an undivided street. Mr. Davis stated that they feel the median would be a major detriment to the industrial development.