Loading...
ParkW CC-1/FP-CS 900314DATE: TO: VIA: FROM: RE: COPPELL PUBLIC WORK~ MEMORANDUM March 14, 1990 Gary Si,b, Director of Planning and~unity _~/ I Steve Goram,~{ector of Public Wor~ ] Russell Doyl~ity Engineer Park West Commerce Center, Final Plat (Planning & Zoning Meeting Date: March 15, Services 1990) Public Works staff has reviewed the above referenced plans and we have the following comments: The final construction plans that we have received for review continue to be incomplete. However, we have continued working faithfully with Mr. Davis, the Project Manager, and have reviewed and responded to him on incremental sections of design plans he has made available to us. You have been provided with previous copies of Engineering DRC checklist comments and letters. 2o We are providing another marked up plan to Mr. Davis including our comments, along with a letter regarding the Floodplain Management Ordinance and Compliance with it. We will provide you with a copy of said letter. 3. Storm sewer plans and profiles have not been submitted as of this date. 4e Floodplain Hydraulic Study has not been submitted as of this date (see attached {this is of special concern} letter from FEMA on property dated August 18, 1987). As per Richard Diane, codes, covenants and restrictions are not acceptable because they do not show the City has ability to access for common area. Sidewalks are requ/red as per the Subdivision Ordinance, Public Works staff does not favor the sidewalk variance. If the applicant is requesting a variance, it must be by letter of request and not just a note on the plat, etc. We are responding to messers Davis, Pritchett, and Tucker on this matter. We still have concerns about the sanitary sewer out-fall. As per attached letter from Mr. Davis, dated March 2, 1990, the Developer does not intend to participate in any offsite sanitary sewer improvement. The 12" sewer is almost at capacity now and a full development of a 24" or larger pipe will be required. A minimum of 20 feet utility easements are required. As you had requested from Mr. Davis during the March 6, 1990, DRC meeting, it is our understanding there will be a note on the final plat stating that ... "all applicable development fees must be paid as each lot develops...". 10. The street name of Southwestern Drive within this property and the one used for the extension of said street to the west are inconsistent. Regardless of the name used, we recommend that the street name be consistent throughout. The street name should be a decision item and Police and Fire should give recommendations. 11. Attached, please find a copy of Engineering Division comments provided during the February 27, 1990 and reused as our present comments as of today. 12. We have no objection to this plat and recomend approval with the condition that final construction plans be approved within 90 days of approval of final plat by the City Council. No construction shall approved construction plans. No construction will take place~adequate ingress and egress and any improvement be constructed toinsure~-he health, safety and welfare of the public. As noted above, there are a myriad of items that have not been addressed at this time and remain as our comment on this project. As mentioned above, we will continue to work with the applicant. Depending upon the Planning and Zoning Commissioner's determination on this plat, we would recommend that any approval and recommendations to the City Council by the P & Z Commission contain a clear conditional or subject to statement based on the completion of the construction drawings including the Floodplain Development Permit. If you have any questions, please let us know. SGG /RRD/MSD/bb xc: Don Davis, Consulting Engineers Mike Tucker, Prentiss Properties PARKWEST.MSD