Loading...
ParkW CC-1/FP-CS 900104COPPELL PUBLIC WORKS NEMORANDIJM January 4, 1990 TO: via: FROM: RE: Gary Sieb, Director of Planning & ~munity Services Steve Goram, Director of Public Wo~ Russell Doyl~ty Engineer Letter from Barton ^schman dated 12/18/89 West Side Thoroughfare Study Regarding your memorandum dated January 2, 1990 in reference to the above, the gest of the memorandum is accurate. However, staff is recommending that the full width of the roadway, whether four lane or six lane paving, be bore by the developer. As you are aware the West Side Thoroughfare Study has begun and our first coordination meeting will take place within the next week. Staff believes that a technical answer to whether a four lane or six lane thoroughfare is needed can be provided prior to the full completion of the study. Should you have any questions, please contact either the Director of Public Works or myself. SGG/RRD/sm