Loading...
ParkW CC-7/Re-DR 971030 (5)I~ELECTRIC Comments for the City of Coppell Development Review Committee ~rc,,,,m~y,' .......... is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, AC/Heat Load) will be required from the developer before easements can be determined. ~/// Other comments "~A~ ~:r~'7- Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234