Princeton Pk/FP-DR 970828 (7)~ELECTRIC
I~mg~y/Final Plat for
Date
Comments for the City of Coppell
Development Review Committee
/Final Plat is not acceptable.
~Easements will be required for proposed electric facilities. A plat with easement
requirements will be provided to the developer.
~Load information (size of structure, AC/Heat Load) will be required from the
developer before easements can be determined.
Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234