Pecan Ridge/FP-CS 910614 The City With A Beautiful Future
June 14, 1991
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Bill Anderson
Dan M. Dowdey & Associates
16250 Dallas Parkway, Ste. 100
Dallas, TX 75248-2684
Re: Pecan Ridge Estates
Development Plans and Fee Assessment
Dear Mr. Anderson:
Attached please find nine {9) approved sets of final construction plans
for the above referenced project. You will also find a list of the
development fee assessment related to this project, dated June 14, 1991.
Please provide a check in the amount of $177,572.13 made payable to the
City of Coppell and forward it to the attention of Ms. Carolyn Bebermeyer,
Finance Department, no later than July 12, 1991.
If you have any questions, please contact Ben dela Cruz or myself at (214)
393-1016. We appreciate your timely attention, and look forward to
working with you on this project.
Sincerely,
Acting City Engineer
MSD/bd
cc:
Gary L. Sieb, Director of Planning and Community Services
Steve Goram, Director of Public Works
Larry Davis, Construction Inspector
Taryon Bowman, P & Z Coordinator
Carolyn Bebermeyer, Finance Department
Ron Freze, Everfine/Gateway Partnership
PECANR
Date:
Project:
CITY OF COPPELL
DEVELOPMENT FEES
June 14, 1991
Pecan Rid§e Estates
PAYABLE BY
TOTAL FEES 7-12-91
Park Fee Assessment
(58 lots X $150 Per Lot)
(50% due at final plat approval)
(50% due prior to bldG. permits
issuance)
Water Impact Fee
(100% due prior to Council approval
of final plat)
Water Tap Inspection Fee
(100% due prior to issuance of
building permit)
Wastewater Impact Fee
(100% due prior to Council approval
of final plat)
Sewer Tap Inspection Fee
(100% due prior to issuance of
buildinG permit)
Street SiGn Assessment
(see attached)
Street LiGht Assessment
($292.60 X poles)
(see attached)
Roadway Assessment/Sandy Lake Road
(706.41' X$170.40 F.F.)
Street Cut Permit
Construction Inspection Fee
(2% of Construction cost)
in the amount of $625,465.50
provided by Dowdey & Assoc.
EnGineers
TOTAL AMOUNT DUE:
8,700.00
$ 38,280.00
$ 5,800.00
· $ 24,476.00
$ 5,800.00
$ 4,350.00
$ 38,280.00
1,960.56 $ 1,960.56
$120,372.26 $120,372.26
$ 100.00 $ 100.00
$ 12,509.31 $ 12,509.31
$217,998.13
'$177,572.13
TOTAL DUE BY JULY 12, 1991
$177,572.13
NOTE: ·
IF PROPERTY TO BE DEVELOPED IS IN THE COPPELL MI~NICIPAL
UTILITY DISTRICT #1, WASTEWATER IMPACT FEE S~ALL BE ASSESSED,
BUT SHALL NOT BE COLLECTED UNTIL SUCH TIME AS AN INTERLOCAL
AGREEMENT IS MADE BETWEEN THE CITY AND MUD.
THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS
THE LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN
SUBMITTED $292.60 PER LIGHT WILL BE ASSESSED.
IS
PECANR1
i By. Engln
FROW. Howar~Pafford, Water Utilities Superintenden
P~E= Development Fees for Pecan Ridge
The following fees should be assessed on the above referenced
project.
Water I~act Fee=
58 - 518" x 3/4"
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
58 ESU's
ESU's
ESU's
Total 58 ESU's ~ $660.00 ea = $38.280.00
100% due prior to Council approval of final plat.
Wastewater I~act Fee=
58 - 5/8" x 3/4" Domestic Meter/s = 58 ESU's ~ $422.00 = $24,476.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
58 Connections ~ $100.00 each = $5.800.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
58 Connections ~ $100.00 each = $5,800.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Sig~s Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
58
Residential Lots at $150.00 each = $8,700.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for .,,Pecan Ridqe
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY
No Parking $ 53.10
Speed Limit $ 63.54 16
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60
Stop & Street Combo $ 96.85 7
OTHER
Yield/Street $ 90.29 1
Keep Riqht $ 58.56 2
Dead End $ 58.56 1
TOTAL
EXTENDED PRICE
$1. O1 6.64
$ 677.95
$ 90.29
$ 117.12
$ 58.56
81.960.56
* Cost breakdowns may be obtained from Public Works by written
request.