Loading...
Parkway Blvd/FP-CS 890119 (2)GINN, INC. CONSULTING ENGINEERS January 19, 1989 Taryon Bowman City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Parkway Blvd. (West) Final Plat DRC - Engineering Dear Taryon: To supplement our comments of January 6, 1989 and clarification purposes, we offer the following comments. for The full width of Parkway Blvd. (West) from Denton Tap Road to the new Coppell High School access drive needs to be constructed at this time. This was discussed by the DRC staff at the first DRC meeting when staff considered the final plat. This shall result in 4 lanes being constructed at this time. The concerns the DRC staff has regarding this issue are: Signalization of this intersection shall be warranted once Parkway Blvd. (West) is open for traffic due to the increase in peak hour traffic volume when school starts. This cannot be accomplished in a safe and efficient manner with only a half street constructed. The planned median nose on the south side of this intersection, on the Denton Tap Road CIP project, will not accommodate left-turn movement onto the south half of Parkway Blvd. without a vehicle riding over the median curb. This is due to the tight turn radius required to complete a left turn movement in this 1/2 street situation. Anticipated traffic volumes both at peak hours and during special events requires a full width street. In lieu of the above factors, it is the DRC's position that public safety with smooth and efficient traffic flow can only be obtained by construction of the full street width at this time. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 We hope this accommodates your needs. Kevin Peif~, P.E. KP/dsp cc: Jerry Parche, P.E. Russell Doyle, P.E. H. Wayne Ginn, P.E. John C. Karlsruher, P.E. File 89305