Loading...
Parkway Blvd/FP-CS 890110COPPELL PUBLIC WORKS January 10, 1989 TO: FROM: RE: Taryon Bowman, Planning & Zoning Coordinator Howard Pafford, Water Foreman Parkway Blvd. - Final Plat I have not yet reviewed the revised set of plans, therefore I cannot comment on my final recommendation at this point. I recommend that the High School access road be dedicated as Public R.O.W. due to the fact that it will be used as a thoroughfare, per our discussion at the last DRC meeting. HLP/sm cc: Steve Goram, Director of Public Works ~e'~'~ev of: Parkway Boulevard, West Ce (x) 1. Fire hydrants required every ~- feet. (x) 2. Must provide au all weather driving surface ou not less than 24 feet of unobstructed width, with adequate roadway turning radius capable of supporting the imposed loads of fire apparatus before construction begins. (x) 3.' Fire hydrants and water system must be operational before construction beEins. ( ) 4. The access roa6way · shall be extended to within 150 feet of all portions of the exterior walls of the first story of any building. (x) 5. Uniform Fire Code, lgB~ is applicable. ( x ) 6. Preliminary/Final ( ) 7. ( ) 8. Refer to plat(s) is/are acceptable. plat is denied. The High School access road can be private or public as long as the Fire Department has access. Troy Glidewell. Fire Marshal -~/-'~-~u~7'