Loading...
Parkway Blvd/FP-CS 890109Jerry Parch Consulting Engineers January 9, 1989 Ms. Taryon Bowman Planning & Zoning Coordinator City of Coppell P O Box 478 Coppell, Texas 75019 214/462-0022 RE: JP No. 88009; Construction Plans; Parkway Boulevard (West); Coppell, Texas Dear Taryon: Enclosed are the sets of construction plans for proposed improvements in Parkway Boulevard and the High School Access Road reviewed by Ginn, Inc. and provided to us on January 6, 1989. Also enclosed is one set of the current construction plans for Site Grading; Water, Sanitary Sewer and Storm Drainage; and Paving Improvements for these proposed roadways as revised in accordance with Ginn's and other Development Review Committee comments. Revisions are described below. 1. Site Grading Plans Variance requested for street lights is deleted. ABQ has agreed to provide street lights with plat approval. A variance is requested for use of a 360 foot radius in the High School Access Road. A separate letter is provided requesting variances. City permission to allow earth moving equipment to cross Right-of-Ways, as stated in Note 5 on the plat, is essential for ABQ to proceed with construction of the streets shown theron at this time. At a meeting on January 6, 1989, it was my understanding that Mr. Kevin Peiffer of Ginn, Inc., upon learning that "owner" as used in this note refers to ABQ Development Corporation, withdrew his objections to this note as long as the conditions for the City granting this permission as stated in Note 5 are maintained. Proposed grades in Parkway Boulevard at the intersection with Denton Tap Road have been coordinated with grades for the Parkway Boulevard turnout designed by Ginn, Inc. Also an inlet is added on the south side of Parkway Boulevard to remove storm water runoff from the street just west of the intersection. 320 Westway Place, Suite 501 · Arlington, Texas 76018 · Metro (817J 467-2418 · (817) 465-0259 Ms. Taryon Bowman JP No. 88009 January 9, 1989 Page 2 of 3 Water, Sanitary Sewer, and Storm Drainage Plans The future 16-inch water line in Denton Tap Road north of Parkway Boulevard is proposed to be located in the Denton Tap Road Right-of-Way. The proposed 8-inch sanitary sewer adjacent to Denton Tap Road is located eleven feet from the west Right-of-Way line. Therefore the distance between the future water main and the currently proposed sanitary sewer is in excess of minimum requirements. Proposed water mains under Denton Tap Road at the Parkway Boulevard intersection will be shown on the water and sanitary sewer layout sheet in accordance with Ginn's plans. The Drainage Area map has been revised such that almost all the runoff from area A-4 (now indicated as area C-i) will be picked up in Storm Drain Line C prior to entering Denton Tap Road. A note is added indicating that storm sewer Stubout D-3a must be extended and Dick up runoff in area D-1 upon development of sites in this drainage area. Construction plans for Storm Drain Line C and a short extension of existing Stubout D-3a will be submitted by Wednesday, January 11, 1989. This drawing will be included as Sheet No. 8 of the Plans. The size of the box culvert in the high school site is corrected on the Drainage Area Map. Paving Plans a. Typical pavement to 23 feet. b. width in Parkway Boulevard is revised A street header is added at the Parkway Boulevard turnout at Denton Tap Road. Grades in shown. the High School Access Road are correct as Ms. Taryon Bowman JP No. 88009 January 9, 1989 Page 3 of 3 I trust that with these revisions the construction plans for Parkway Boulevard and the High School Access Road are in compliance with City of Coppell requirements. If you have any questions, please call. Sincerely, Parche' , P.E. JP:ch Enclosure: One set of Construction Plans-Marked up by Ginn, Inc. One set of Construction Plans-Revised cc: Mr. Jay Chester, P.E./ABQ Development Corporation