Raintree Vill/FP-CS 841212GINN, INC.
December 12, 1984
CONSULTING ENGINEERS
MEMO TO:
SUBJECT:
Ron Ragland, City Manager
RAINTREE VILLAGE ON LAKES OF COPPELL
PRELIMINARY PLAT
We have reviewed the preliminary plat for the subject project. By copy
of this letter, we are returning the plat to Joe D'Angeloni with Nelson
Engineering Corporation for the appropriate revisions, and also advising
them at this time that it will not make the December 20 P & Z Agenda.
The following items need to be addressed prior to it being placed on an
agenda:
Storm drainage in the northwest corner of the project must be
coordinated with the design that Triland's engineers are now
completing. There are drainage problems in this portion of the
property, and this preliminary plat as shown would not drain
properly.
The road alignments tying into MacArthur must also be coordinated
with the engineering plans being prepared by Triland to coordinate
median openings.
3. Minimum size for water and sewer lines is 8 inches in diameter.
4. A drainage area map showing the drainage areas and the concentra-
tions of water and the sizes of pipe must also be shown.
- As soon as we receive these revisions and review them accordingly,
it can then be placed on the P & Z Agenda as a preliminary plat item.
HWG:jc
cc:
Nelson Engineering Corporation
7311 Ferguson Road
Dallas, TX
16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611