Loading...
Raintree Vill/FP-CS 850410GINN, INC. CONSULTING ENGINEERS TO: FROM: DATE: SUBJECT: Ron Ragland Attn: Mark Sweeney GINN, INC. April 10, 1985 Raintree Village Final Plat Our firm has reviewed the above plat and construction plans for conformance with the City of Coppell Subdivision Ordinance. We do not recommend that it be placed on the April 18, 1985, Planning and Zoning Commission agenda for approval. Enclosed please find a copy of our letter to the developer of this project. Please feel free to contact me concerning the above. ~V. Wa~kum, P.E. /sr Enclosure 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611 GINN, INC. April 2, 1985 CONSULTING ENGINEERS Nelson Engineering Corporation 7311 Ferguson Road Dallas, Texas 75228 Re: Raintree Village Final Plat and Construction Plans Coppell, Texas Gentlemen: This firm has reviewed the above plat and plans for conformance with applicable City ordinances. Before we can recommend that it be placed on the Planning and Zoning Commission agenda for approval, the following items need to be addressed. An owner's association must be responsible for the maintenance of screening walls and landscaping per streetscape plan. 2. Sidewalks are required along MacArthur Boulevard. Please provide a visual barrier such as a screening wall between DeForest Road and the alley along Block A. Please show drainage areas along MacArthur Boulevard and outlet points. Please provide a landscape plan conforming to street- scape plan. A landscaped median entrance is recommended at Lake Forest Drive and Village Drive. Please show limits of 100-year flood on drainage area map and plat. Please show condition of property to east, particularly at drainage outlet and streets. Have owners to the north and east furnished an easement for drainage outlet? Should the 8' sewer main on line A be extended to the east? 8. Provide a street lighting plan. Please show sidewalks or show when they will be constructed. 10. Horizontal curves in sanitary sewers are not permitted. 11. The distance from sewer clean-outs to a manhole should not exceed 220'. Iel3'3Prcqon RoaA · ,qui~c 106 · Dalla-,Tcxa- 7~248 · Phone21.1, 12. Please show storm sewer laterals in profiles. Please maintain minimum 1.5' vertical clearance between water and sewer mains. Please feel free to contact me concerning the above. Sincerely, GINN, INC. o~hn V.'Wankum, P.E. /sr cc: Ron Ragland